{"name":"The Digital Project Manager","description":"Work Smarter. Deliver Faster. Lead Better.","url":"https:\/\/thedigitalprojectmanager.com","home":"https:\/\/thedigitalprojectmanager.com","gmt_offset":-7,"timezone_string":"America\/Vancouver","page_for_posts":0,"page_on_front":1318,"show_on_front":"page","namespaces":["oembed\/1.0","wpe\/cache-plugin\/v1","wpe_sign_on_plugin\/v1","redirection\/v1","yoast\/v1","cky\/v1","jetpack\/v4","mp\/v1","mpdl","tribe\/v1","bwz\/v1","pll\/v1","wpcom\/v2","jetpack\/v4\/stats-app","bwz-upgrader\/v1","duplicate-post\/v1","wpcom\/v3","jetpack-boost\/v1","my-jetpack\/v1","jetpack\/v4\/explat","gf\/v2","omapp\/v1","gwiz\/v1","wp\/v2","wp-site-health\/v1","wp-block-editor\/v1","wp-abilities\/v1"],"authentication":{"application-passwords":{"endpoints":{"authorization":"https:\/\/thedigitalprojectmanager.com\/wp-admin\/authorize-application.php"}}},"routes":{"\/":{"namespace":"","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/"}]}},"\/batch\/v1":{"namespace":"","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"validation":{"type":"string","enum":["require-all-validate","normal"],"default":"normal","required":false},"requests":{"type":"array","maxItems":25,"items":{"type":"object","properties":{"method":{"type":"string","enum":["POST","PUT","PATCH","DELETE"],"default":"POST"},"path":{"type":"string","required":true},"body":{"type":"object","properties":[],"additionalProperties":true},"headers":{"type":"object","properties":[],"additionalProperties":{"type":["string","array"],"items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/batch\/v1"}]}},"\/oembed\/1.0":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"oembed\/1.0","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/oembed\/1.0"}]}},"\/oembed\/1.0\/embed":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"default":"json","required":false},"maxwidth":{"default":600,"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/oembed\/1.0\/embed"}]}},"\/oembed\/1.0\/proxy":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"description":"The oEmbed format to use.","type":"string","default":"json","enum":["json","xml"],"required":false},"maxwidth":{"description":"The maximum width of the embed frame in pixels.","type":"integer","default":600,"required":false},"maxheight":{"description":"The maximum height of the embed frame in pixels.","type":"integer","required":false},"discover":{"description":"Whether to perform an oEmbed discovery request for unsanctioned providers.","type":"boolean","default":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/oembed\/1.0\/proxy"}]}},"\/wpe\/cache-plugin\/v1":{"namespace":"wpe\/cache-plugin\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpe\/cache-plugin\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpe\/cache-plugin\/v1"}]}},"\/wpe\/cache-plugin\/v1\/clear_all_caches":{"namespace":"wpe\/cache-plugin\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpe\/cache-plugin\/v1\/clear_all_caches"}]}},"\/wpe\/cache-plugin\/v1\/rate_limit_status":{"namespace":"wpe\/cache-plugin\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpe\/cache-plugin\/v1\/rate_limit_status"}]}},"\/wpe_sign_on_plugin\/v1":{"namespace":"wpe_sign_on_plugin\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpe_sign_on_plugin\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpe_sign_on_plugin\/v1"}]}},"\/wpe_sign_on_plugin\/v1\/login":{"namespace":"wpe_sign_on_plugin\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpe_sign_on_plugin\/v1\/login"}]}},"\/wpe_sign_on_plugin\/v1\/is_user_logged_in":{"namespace":"wpe_sign_on_plugin\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpe_sign_on_plugin\/v1\/is_user_logged_in"}]}},"\/wpe_sign_on_plugin\/v1\/has_logged":{"namespace":"wpe_sign_on_plugin\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpe_sign_on_plugin\/v1\/has_logged"}]}},"\/redirection\/v1":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"redirection\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/redirection\/v1"}]}},"\/redirection\/v1\/redirect":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["source","last_count","last_access","position","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["source","last_count","last_access","position","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/redirection\/v1\/redirect"}]}},"\/redirection\/v1\/redirect\/(?P<id>[\\d]+)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/redirection\/v1\/redirect\/post":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"text":{"description":"Text to match","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/redirection\/v1\/redirect\/post"}]}},"\/redirection\/v1\/bulk\/redirect\/(?P<bulk>delete|enable|disable|reset)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["source","last_count","last_access","position","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"global":{"description":"Apply bulk action globally, as per filters","type":"boolean","required":false},"items":{"description":"Array of IDs to perform action on","type":"array","items":{"description":"Item ID","type":["string","number"]},"required":false}}}]},"\/redirection\/v1\/group":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["name","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["name","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"moduleId":{"description":"Module ID","type":"integer","minimum":0,"maximum":3,"required":true},"name":{"description":"Group name","type":"string","required":true},"status":{"description":"Status of the group","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/redirection\/v1\/group"}]}},"\/redirection\/v1\/group\/(?P<id>[\\d]+)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"moduleId":{"description":"Module ID","type":"integer","minimum":0,"maximum":3,"required":true},"name":{"description":"Group name","type":"string","required":true},"status":{"description":"Status of the group","required":false}}}]},"\/redirection\/v1\/bulk\/group\/(?P<bulk>delete|enable|disable)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["name","id",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"items":{"description":"Comma separated list of item IDs to perform action on","type":"array","items":{"description":"Item ID","type":["string","number"]},"required":false}}}]},"\/redirection\/v1\/log":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["url","ip","total","count",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/redirection\/v1\/log"}]}},"\/redirection\/v1\/bulk\/log\/(?P<bulk>delete)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["url","ip","total","count",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"items":{"description":"Comma separated list of item IDs to perform action on","type":"array","items":{"description":"Item ID","type":["string","number"]},"required":false}}}]},"\/redirection\/v1\/404":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["url","ip","total","count",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/redirection\/v1\/404"}]}},"\/redirection\/v1\/bulk\/404\/(?P<bulk>delete)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filterBy":{"description":"Field to filter by","required":false},"orderby":{"description":"Field to order results by","type":"string","enum":["url","ip","total","count",""],"required":false},"direction":{"description":"Direction of ordered results","type":"string","default":"desc","enum":["asc","desc"],"required":false},"per_page":{"description":"Number of results per page","type":"integer","default":25,"minimum":5,"maximum":200,"required":false},"page":{"description":"Page offset","type":"integer","minimum":0,"default":0,"required":false},"items":{"description":"Comma separated list of item IDs to perform action on","type":"array","items":{"description":"Item ID","type":["string","number"]},"required":false}}}]},"\/redirection\/v1\/setting":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/redirection\/v1\/setting"}]}},"\/redirection\/v1\/plugin":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"name":{"description":"Name","type":"string","required":false},"value":{"description":"Value","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/redirection\/v1\/plugin"}]}},"\/redirection\/v1\/plugin\/delete":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/redirection\/v1\/plugin\/delete"}]}},"\/redirection\/v1\/plugin\/test":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/redirection\/v1\/plugin\/test"}]}},"\/redirection\/v1\/plugin\/data":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"upgrade":{"description":"Upgrade parameter","type":"string","enum":["stop","skip","retry"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/redirection\/v1\/plugin\/data"}]}},"\/redirection\/v1\/plugin\/finish":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/redirection\/v1\/plugin\/finish"}]}},"\/redirection\/v1\/plugin\/fix":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"reason":{"description":"Reason for fix","type":"string","required":true},"current":{"description":"Current version","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/redirection\/v1\/plugin\/fix"}]}},"\/redirection\/v1\/import\/file\/(?P<group_id>\\d+)":{"namespace":"redirection\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/redirection\/v1\/import\/plugin":{"namespace":"redirection\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/redirection\/v1\/import\/plugin"}]}},"\/redirection\/v1\/export\/(?P<module>1|2|3|all)\/(?P<format>csv|apache|nginx|json)":{"namespace":"redirection\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/yoast\/v1":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"yoast\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1"}]}},"\/yoast\/v1\/file_size":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"type":"string","description":"The url to retrieve","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/file_size"}]}},"\/yoast\/v1\/statistics":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/statistics"}]}},"\/yoast\/v1\/ai_generator\/callback":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"access_jwt":{"type":"string","description":"The access JWT.","required":true},"refresh_jwt":{"type":"string","description":"The JWT to be used when the access JWT needs to be refreshed.","required":true},"code_challenge":{"type":"string","description":"The SHA266 of the verification code used to check the authenticity of a callback call.","required":true},"user_id":{"type":"integer","description":"The id of the user associated to the code verifier.","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/ai_generator\/callback"}]}},"\/yoast\/v1\/ai_generator\/refresh_callback":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"access_jwt":{"type":"string","description":"The access JWT.","required":true},"refresh_jwt":{"type":"string","description":"The JWT to be used when the access JWT needs to be refreshed.","required":true},"code_challenge":{"type":"string","description":"The SHA266 of the verification code used to check the authenticity of a callback call.","required":true},"user_id":{"type":"integer","description":"The id of the user associated to the code verifier.","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/ai_generator\/refresh_callback"}]}},"\/yoast\/v1\/ai_generator\/consent":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"consent":{"type":"boolean","description":"Whether the consent to use AI-based services has been given by the user.","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/ai_generator\/consent"}]}},"\/yoast\/v1\/ai\/free_sparks":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/ai\/free_sparks"}]}},"\/yoast\/v1\/ai_generator\/bust_subscription_cache":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/ai_generator\/bust_subscription_cache"}]}},"\/yoast\/v1\/ai_generator\/get_suggestions":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"type":{"type":"string","enum":["seo-title","meta-description","product-seo-title","product-meta-description","product-taxonomy-seo-title","product-taxonomy-meta-description","taxonomy-seo-title","taxonomy-meta-description"],"description":"The type of suggestion requested.","required":true},"prompt_content":{"type":"string","description":"The content needed by the prompt to ask for suggestions.","required":true},"focus_keyphrase":{"type":"string","description":"The focus keyphrase associated to the post.","required":true},"language":{"type":"string","description":"The language the post is written in.","required":true},"platform":{"type":"string","enum":["Google","Facebook","Twitter"],"description":"The platform the post is intended for.","required":true},"editor":{"type":"string","enum":["classic","elementor","gutenberg"],"description":"The current editor.","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/ai_generator\/get_suggestions"}]}},"\/yoast\/v1\/ai_generator\/get_usage":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"is_woo_product_entity":{"type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/ai_generator\/get_usage"}]}},"\/yoast\/v1\/new-content-type-visibility\/dismiss-post-type":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"postTypeName":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/new-content-type-visibility\/dismiss-post-type"}]}},"\/yoast\/v1\/new-content-type-visibility\/dismiss-taxonomy":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"taxonomyName":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/new-content-type-visibility\/dismiss-taxonomy"}]}},"\/yoast\/v1\/site_kit_configuration_permanent_dismissal":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"is_dismissed":{"type":"bool","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/site_kit_configuration_permanent_dismissal"}]}},"\/yoast\/v1\/readability_scores":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"contentType":{"type":"string","required":true},"taxonomy":{"type":"string","default":"","required":false},"term":{"type":"integer","default":null,"required":false},"troubleshooting":{"type":"bool","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/readability_scores"}]}},"\/yoast\/v1\/seo_scores":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"contentType":{"type":"string","required":true},"taxonomy":{"type":"string","default":"","required":false},"term":{"type":"integer","default":null,"required":false},"troubleshooting":{"type":"bool","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/seo_scores"}]}},"\/yoast\/v1\/setup_steps_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"setup_widget_loaded":{"type":"string","enum":["yes","no"],"required":false},"first_interaction_stage":{"type":"string","enum":["install","activate","setup","grantConsent","successfullyConnected"],"required":false},"last_interaction_stage":{"type":"string","enum":["install","activate","setup","grantConsent","successfullyConnected"],"required":false},"setup_widget_temporarily_dismissed":{"type":"string","enum":["yes","no"],"required":false},"setup_widget_permanently_dismissed":{"type":"string","enum":["yes","no"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/setup_steps_tracking"}]}},"\/yoast\/v1\/introductions\/(?P<introduction_id>[\\w-]+)\/seen":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"introduction_id":{"type":"string","required":true},"is_seen":{"type":"bool","default":true,"required":false}}}]},"\/yoast\/v1\/wistia_embed_permission":{"namespace":"yoast\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"value":{"type":"bool","default":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/wistia_embed_permission"}]}},"\/yoast\/v1\/available_posts":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"search":{"type":"string","default":"","required":false},"postType":{"type":"string","default":"page","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/available_posts"}]}},"\/yoast\/v1\/alerts\/dismiss":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"key":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/alerts\/dismiss"}]}},"\/yoast\/v1\/configuration\/site_representation":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"company_or_person":{"type":"string","enum":["company","person"],"required":true},"company_name":{"type":"string","required":false},"company_logo":{"type":"string","required":false},"company_logo_id":{"type":"integer","required":false},"person_logo":{"type":"string","required":false},"person_logo_id":{"type":"integer","required":false},"company_or_person_user_id":{"type":"integer","required":false},"description":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/configuration\/site_representation"}]}},"\/yoast\/v1\/configuration\/social_profiles":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"facebook_site":{"type":"string","required":false},"twitter_site":{"type":"string","required":false},"other_social_urls":{"type":"array","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/configuration\/social_profiles"}]}},"\/yoast\/v1\/configuration\/check_capability":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"user_id":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/configuration\/check_capability"}]}},"\/yoast\/v1\/configuration\/enable_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"tracking":{"type":"boolean","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/configuration\/enable_tracking"}]}},"\/yoast\/v1\/configuration\/save_configuration_state":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"finishedSteps":{"type":"array","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/configuration\/save_configuration_state"}]}},"\/yoast\/v1\/configuration\/get_configuration_state":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/configuration\/get_configuration_state"}]}},"\/yoast\/v1\/import\/(?P<plugin>[\\w-]+)\/(?P<type>[\\w-]+)":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/yoast\/v1\/get_head":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/get_head"}]}},"\/yoast\/v1\/indexing\/posts":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/indexing\/posts"}]}},"\/yoast\/v1\/indexing\/terms":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/indexing\/terms"}]}},"\/yoast\/v1\/indexing\/post-type-archives":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/indexing\/post-type-archives"}]}},"\/yoast\/v1\/indexing\/general":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/indexing\/general"}]}},"\/yoast\/v1\/indexing\/prepare":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/indexing\/prepare"}]}},"\/yoast\/v1\/indexing\/indexables-complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/indexing\/indexables-complete"}]}},"\/yoast\/v1\/indexing\/complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/indexing\/complete"}]}},"\/yoast\/v1\/link-indexing\/posts":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/link-indexing\/posts"}]}},"\/yoast\/v1\/link-indexing\/terms":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/link-indexing\/terms"}]}},"\/yoast\/v1\/integrations\/set_active":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"active":{"type":"boolean","required":true},"integration":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/integrations\/set_active"}]}},"\/yoast\/v1\/meta\/search":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/meta\/search"}]}},"\/yoast\/v1\/semrush\/authenticate":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"code":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/semrush\/authenticate"}]}},"\/yoast\/v1\/semrush\/country_code":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"country_code":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/semrush\/country_code"}]}},"\/yoast\/v1\/semrush\/related_keyphrases":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"keyphrase":{"required":true},"country_code":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/semrush\/related_keyphrases"}]}},"\/yoast\/v1\/workouts":{"namespace":"yoast\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"cornerstone":{"required":true},"orphaned":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/workouts"}]}},"\/yoast\/v1\/complete_task":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"options":{"type":"object","properties":{"task":{"type":"string","required":true,"sanitize_callback":"sanitize_text_field"}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/complete_task"}]}},"\/yoast\/v1\/get_tasks":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"options":{"type":"object","properties":{"filter":{"type":"string","required":false,"sanitize_callback":"sanitize_text_field"},"limit":{"type":"int","required":false,"sanitize_callback":"absint"}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/get_tasks"}]}},"\/yoast\/v1\/action_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"action":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/action_tracking"}]}},"\/yoast\/v1\/ai\/optimize":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"assessment":{"type":"string","enum":["seo-keyphrase-introduction","seo-keyphrase-density","seo-keyphrase-distribution","seo-keyphrase-subheadings","read-sentence-length","read-paragraph-length"],"description":"The assessment.","required":true},"language":{"type":"string","description":"The language the post is written in.","required":true},"prompt_content":{"type":"string","description":"The content needed by the prompt to ask for suggestions.","required":true},"focus_keyphrase":{"type":"string","description":"The focus keyphrase associated to the post.","required":false},"synonyms":{"type":"string","description":"The synonyms for the focus keyphrase.","required":false},"editor":{"type":"string","enum":["Classic","Gutenberg"],"description":"The editor type, either Classic or Gutenberg.","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/ai\/optimize"}]}},"\/yoast\/v1\/ai\/summarize":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"language":{"type":"string","description":"The language the post is written in.","required":true},"prompt_content":{"type":"string","description":"The content needed by the prompt to ask for a summary.","required":true},"focus_keyphrase":{"type":"string","description":"The focus keyphrase associated to the post.","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/ai\/summarize"}]}},"\/yoast\/v1\/link_suggestions":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"prominent_words":{"type":"object","description":"Stems of prominent words and their term frequencies we want link suggestions based on","required":true},"object_id":{"type":"integer","description":"The object id of the current indexable.","required":true},"object_type":{"type":"string","description":"The object type of the current indexable.","required":true},"limit":{"default":5,"type":"integer","description":"The maximum number of link suggestions to retrieve","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/link_suggestions"}]}},"\/yoast\/v1\/prominent_words\/get_content":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/prominent_words\/get_content"}]}},"\/yoast\/v1\/prominent_words\/complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/prominent_words\/complete"}]}},"\/yoast\/v1\/prominent_words\/save":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"data":{"type":"array","items":{"type":"object","properties":{"object_id":{"type":"number","required":true},"prominent_words":{"type":"object","required":false}}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/prominent_words\/save"}]}},"\/yoast\/v1\/workouts\/noindex":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"object_id":{"type":"integer","required":true},"object_type":{"type":"string","required":true},"object_sub_type":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/workouts\/noindex"}]}},"\/yoast\/v1\/workouts\/remove_redirect":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"object_id":{"type":"integer","required":true},"object_type":{"type":"string","required":true},"object_sub_type":{"type":"string","required":true},"permalink":{"type":"string","required":true},"redirect_url":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/workouts\/remove_redirect"}]}},"\/yoast\/v1\/workouts\/link_suggestions":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"indexableId":{"type":"integer","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/workouts\/link_suggestions"}]}},"\/yoast\/v1\/workouts\/last_updated":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"postId":{"type":"integer","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/workouts\/last_updated"}]}},"\/yoast\/v1\/workouts\/cornerstone_data":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/workouts\/cornerstone_data"}]}},"\/yoast\/v1\/workouts\/enable_cornerstone":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"object_id":{"type":"integer","required":true},"object_type":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/workouts\/enable_cornerstone"}]}},"\/cky\/v1":{"namespace":"cky\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"cky\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1"}]}},"\/cky\/v1\/settings":{"namespace":"cky\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"force":{"type":"boolean","description":"Force fetch data","required":false}}},{"methods":["POST"],"args":{"site":{"description":"Unique identifier for the resource.","type":"object","required":false},"api":{"description":"Language.","type":"object","required":false},"account":{"description":"Language.","type":"object","required":false},"consent_logs":{"description":"Language.","type":"object","required":false},"languages":{"description":"Language.","type":"object","required":false},"onboarding":{"description":"Language.","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/settings"}]}},"\/cky\/v1\/settings\/laws":{"namespace":"cky\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"force":{"type":"boolean","description":"Force fetch data","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/settings\/laws"}]}},"\/cky\/v1\/settings\/info":{"namespace":"cky\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"force":{"type":"boolean","description":"Force fetch data","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/settings\/info"}]}},"\/cky\/v1\/settings\/disconnect":{"namespace":"cky\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"force":{"type":"boolean","description":"Force fetch data","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/settings\/disconnect"}]}},"\/cky\/v1\/settings\/sync":{"namespace":"cky\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false},"site":{"description":"Unique identifier for the resource.","type":"object","required":false},"api":{"description":"Language.","type":"object","required":false},"account":{"description":"Language.","type":"object","required":false},"consent_logs":{"description":"Language.","type":"object","required":false},"languages":{"description":"Language.","type":"object","required":false},"onboarding":{"description":"Language.","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/settings\/sync"}]}},"\/cky\/v1\/settings\/cache\/purge":{"namespace":"cky\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"force":{"type":"boolean","description":"Force fetch data","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/settings\/cache\/purge"}]}},"\/cky\/v1\/settings\/notices\/(?P<notice>[a-zA-Z0-9-_]+)":{"namespace":"cky\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"force":{"type":"boolean","description":"Force fetch data","required":false}}}]},"\/cky\/v1\/settings\/expand":{"namespace":"cky\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"force":{"type":"boolean","description":"Force fetch data","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/settings\/expand"}]}},"\/cky\/v1\/settings\/connect_notice":{"namespace":"cky\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"force":{"type":"boolean","description":"Force fetch data","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/settings\/connect_notice"}]}},"\/cky\/v1\/settings\/reinstall":{"namespace":"cky\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"force":{"type":"boolean","description":"Force fetch data","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/settings\/reinstall"}]}},"\/cky\/v1\/settings\/apply_filter":{"namespace":"cky\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"force":{"type":"boolean","description":"Force fetch data","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/settings\/apply_filter"}]}},"\/cky\/v1\/settings\/notices\/pageviews_overage_notice":{"namespace":"cky\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"force":{"type":"boolean","description":"Force fetch data","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/settings\/notices\/pageviews_overage_notice"}]}},"\/cky\/v1\/settings\/payments":{"namespace":"cky\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"force":{"type":"boolean","description":"Force fetch data","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/settings\/payments"}]}},"\/cky\/v1\/gcm":{"namespace":"cky\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"status":{"description":"GCM status.","type":"boolean","required":false},"default_settings":{"description":"Default settings.","type":"array","required":false},"wait_for_update":{"description":"Wait for update.","type":"integer","required":false},"url_passthrough":{"description":"Pass ad click information through URLs.","type":"boolean","required":false},"ads_data_redaction":{"description":"Redact ads data.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/gcm"}]}},"\/cky\/v1\/languages":{"namespace":"cky\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"language":{"description":"Name of the language.","type":"string","required":false},"native_name":{"description":"Native name of the language.","type":"string","required":false},"lang":{"description":"Language code","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/languages"}]}},"\/cky\/v1\/languages\/available":{"namespace":"cky\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/languages\/available"}]}},"\/cky\/v1\/languages\/translations":{"namespace":"cky\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/languages\/translations"}]}},"\/cky\/v1\/dashboard\/summary":{"namespace":"cky\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/dashboard\/summary"}]}},"\/cky\/v1\/dashboard\/plans":{"namespace":"cky\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/dashboard\/plans"}]}},"\/cky\/v1\/dashboard\/currencies":{"namespace":"cky\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/dashboard\/currencies"}]}},"\/cky\/v1\/banners":{"namespace":"cky\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"ver":{"description":"Version","type":"string","required":false},"language":{"description":"Language of the banner","type":"string","required":false}}},{"methods":["POST"],"args":{"name":{"description":"Banner name for reference","type":"string","required":false},"slug":{"description":"Banner unique name","type":"string","required":false},"settings":{"description":"Banner settings.","type":"array","required":false},"contents":{"description":"Banner contents.","type":"object","required":false},"default":{"description":"Indicates whether the banner is default or not","type":"boolean","required":false},"date_modified":{"description":"The date the banner was last modified, as GMT.","type":"date-time","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/banners"}]}},"\/cky\/v1\/banners\/bulk":{"namespace":"cky\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"name":{"description":"Banner name for reference","type":"string","required":false},"slug":{"description":"Banner unique name","type":"string","required":false},"settings":{"description":"Banner settings.","type":"array","required":false},"contents":{"description":"Banner contents.","type":"object","required":false},"default":{"description":"Indicates whether the banner is default or not","type":"boolean","required":false},"date_modified":{"description":"The date the banner was last modified, as GMT.","type":"date-time","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/banners\/bulk"}]}},"\/cky\/v1\/banners\/(?P<id>[\\d]+)":{"namespace":"cky\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false},"name":{"description":"Banner name for reference","type":"string","required":false},"slug":{"description":"Banner unique name","type":"string","required":false},"settings":{"description":"Banner settings.","type":"array","required":false},"contents":{"description":"Banner contents.","type":"object","required":false},"default":{"description":"Indicates whether the banner is default or not","type":"boolean","required":false},"date_modified":{"description":"The date the banner was last modified, as GMT.","type":"date-time","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false},"name":{"description":"Banner name for reference","type":"string","required":false},"slug":{"description":"Banner unique name","type":"string","required":false},"settings":{"description":"Banner settings.","type":"array","required":false},"contents":{"description":"Banner contents.","type":"object","required":false},"default":{"description":"Indicates whether the banner is default or not","type":"boolean","required":false},"date_modified":{"description":"The date the banner was last modified, as GMT.","type":"date-time","required":false}}}]},"\/cky\/v1\/banners\/preview":{"namespace":"cky\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"name":{"description":"Banner name for reference","type":"string","required":false},"slug":{"description":"Banner unique name","type":"string","required":false},"settings":{"description":"Banner settings.","type":"array","required":false},"contents":{"description":"Banner contents.","type":"object","required":false},"default":{"description":"Indicates whether the banner is default or not","type":"boolean","required":false},"date_modified":{"description":"The date the banner was last modified, as GMT.","type":"date-time","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/banners\/preview"}]}},"\/cky\/v1\/banners\/presets":{"namespace":"cky\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"ver":{"description":"Version","type":"string","required":false},"language":{"description":"Language of the banner","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/banners\/presets"}]}},"\/cky\/v1\/banners\/configs":{"namespace":"cky\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"ver":{"description":"Version","type":"string","required":false},"language":{"description":"Language of the banner","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/banners\/configs"}]}},"\/cky\/v1\/cookies\/categories":{"namespace":"cky\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"lang":{"description":"Language of the cookie","type":"string","required":false},"category":{"description":"Cookie category","type":"integer","required":false}}},{"methods":["POST"],"args":{"name":{"description":"Cookie category name.","type":"object","required":false},"slug":{"description":"Cookie category unique name","type":"string","required":false},"language":{"description":"Cookie category language","type":"string","required":false},"description":{"description":"Cookie category description.","type":"object","required":false},"prior_consent":{"description":"Cookie type.","type":"boolean","required":false},"priority":{"description":"Cookie type.","type":"integer","required":false},"visibility":{"description":"Show cookies on audit table or not","type":"boolean","required":false},"sell_personal_data":{"description":"Show cookies on audit table or not","type":"boolean","required":false},"cookies":{"description":"Cookie category description.","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/cookies\/categories"}]}},"\/cky\/v1\/cookies\/categories\/bulk":{"namespace":"cky\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"name":{"description":"Cookie category name.","type":"object","required":false},"slug":{"description":"Cookie category unique name","type":"string","required":false},"language":{"description":"Cookie category language","type":"string","required":false},"description":{"description":"Cookie category description.","type":"object","required":false},"prior_consent":{"description":"Cookie type.","type":"boolean","required":false},"priority":{"description":"Cookie type.","type":"integer","required":false},"visibility":{"description":"Show cookies on audit table or not","type":"boolean","required":false},"sell_personal_data":{"description":"Show cookies on audit table or not","type":"boolean","required":false},"cookies":{"description":"Cookie category description.","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/cookies\/categories\/bulk"}]}},"\/cky\/v1\/cookies\/categories\/(?P<id>[\\d]+)":{"namespace":"cky\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false},"name":{"description":"Cookie category name.","type":"object","required":false},"slug":{"description":"Cookie category unique name","type":"string","required":false},"language":{"description":"Cookie category language","type":"string","required":false},"description":{"description":"Cookie category description.","type":"object","required":false},"prior_consent":{"description":"Cookie type.","type":"boolean","required":false},"priority":{"description":"Cookie type.","type":"integer","required":false},"visibility":{"description":"Show cookies on audit table or not","type":"boolean","required":false},"sell_personal_data":{"description":"Show cookies on audit table or not","type":"boolean","required":false},"cookies":{"description":"Cookie category description.","type":"object","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false}}}]},"\/cky\/v1\/cookies":{"namespace":"cky\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"lang":{"description":"Language of the cookie","type":"string","required":false},"category":{"description":"Cookie category","type":"integer","required":false}}},{"methods":["POST"],"args":{"date_modified":{"description":"The date the cookie was last modified, as GMT.","type":"string","required":false},"name":{"description":"Cookie name.","type":"string","required":false},"category":{"description":"Cookie category name.","type":"integer","required":false},"slug":{"description":"Cookie unique name","type":"string","required":false},"description":{"description":"Cookie description.","type":"object","required":false},"duration":{"description":"Cookie duration","type":"object","required":false},"language":{"description":"Cookie language.","type":"string","required":false},"type":{"description":"Cookie type.","type":"integer","required":false},"domain":{"description":"Cookie domain.","type":"string","required":false},"discovered":{"description":"If cookies added from the scanner or not.","type":"boolean","required":false},"url_pattern":{"description":"URL patterns for blocking purposes","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/cookies"}]}},"\/cky\/v1\/cookies\/(?P<id>[\\d]+)":{"namespace":"cky\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false},"date_modified":{"description":"The date the cookie was last modified, as GMT.","type":"string","required":false},"name":{"description":"Cookie name.","type":"string","required":false},"category":{"description":"Cookie category name.","type":"integer","required":false},"slug":{"description":"Cookie unique name","type":"string","required":false},"description":{"description":"Cookie description.","type":"object","required":false},"duration":{"description":"Cookie duration","type":"object","required":false},"language":{"description":"Cookie language.","type":"string","required":false},"type":{"description":"Cookie type.","type":"integer","required":false},"domain":{"description":"Cookie domain.","type":"string","required":false},"discovered":{"description":"If cookies added from the scanner or not.","type":"boolean","required":false},"url_pattern":{"description":"URL patterns for blocking purposes","type":"string","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false}}}]},"\/cky\/v1\/consent_logs\/statistics":{"namespace":"cky\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/consent_logs\/statistics"}]}},"\/cky\/v1\/scans":{"namespace":"cky\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}},{"methods":["POST"],"args":{"name":{"description":"Cookie category name.","type":"string","required":false},"slug":{"description":"Cookie category unique name","type":"string","required":false},"description":{"description":"Cookie category description.","type":"string","required":false},"default_state":{"description":"Cookie type.","type":"string","required":false},"head_scripts":{"description":"Cookie scripts.","type":"string","required":false},"body_scripts":{"description":"Cookie scripts.","type":"string","required":false},"cookies":{"description":"Cookie count.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/scans"}]}},"\/cky\/v1\/scans\/(?P<id>[\\d]+)":{"namespace":"cky\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false}}}]},"\/cky\/v1\/scans\/details\/(?P<id>[\\d]+)":{"namespace":"cky\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false}}}]},"\/cky\/v1\/uninstall-feedback":{"namespace":"cky\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/uninstall-feedback"}]}},"\/cky\/v1\/pageviews\/chart":{"namespace":"cky\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/cky\/v1\/pageviews\/chart"}]}},"\/jetpack\/v4":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"jetpack\/v4","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4"}]}},"\/jetpack\/v4\/backup-helper-script":{"namespace":"jetpack\/v4","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":{"helper":{"description":"base64 encoded Backup Helper Script body.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"path":{"description":"Path to Backup Helper Script","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/backup-helper-script"}]}},"\/jetpack\/v4\/database-object\/backup":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"object_type":{"description":"Type of object to fetch from the database","required":true},"object_id":{"description":"ID of the database object to fetch","type":"integer","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/database-object\/backup"}]}},"\/jetpack\/v4\/options\/backup":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"One or more option names to include in the backup","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/options\/backup"}]}},"\/jetpack\/v4\/comments\/(?P<id>\\d+)\/backup":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/posts\/(?P<id>\\d+)\/backup":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/terms\/(?P<id>\\d+)\/backup":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/users\/(?P<id>\\d+)\/backup":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/site\/backup\/undo-event":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/site\/backup\/undo-event"}]}},"\/jetpack\/v4\/orders\/(?P<id>\\d+)\/backup":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/site\/backup\/preflight":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/site\/backup\/preflight"}]}},"\/jetpack\/v4\/jetpack-ai-jwt":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/jetpack-ai-jwt"}]}},"\/jetpack\/v4\/plans":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/plans"}]}},"\/jetpack\/v4\/products":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/products"}]}},"\/jetpack\/v4\/marketing\/survey":{"namespace":"jetpack\/v4","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/marketing\/survey"}]}},"\/jetpack\/v4\/connection\/test":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/connection\/test"}]}},"\/jetpack\/v4\/connection\/test-wpcom":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/connection\/test-wpcom"}]}},"\/jetpack\/v4\/rewind":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/rewind"}]}},"\/jetpack\/v4\/scan":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/scan"}]}},"\/jetpack\/v4\/connection\/url":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"from":{"type":"string","required":false},"redirect":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/connection\/url"}]}},"\/jetpack\/v4\/tracking\/settings":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"tracks_opt_out":{"type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/tracking\/settings"}]}},"\/jetpack\/v4\/site":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/site"}]}},"\/jetpack\/v4\/site\/features":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/site\/features"}]}},"\/jetpack\/v4\/site\/products":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/site\/products"}]}},"\/jetpack\/v4\/site\/purchases":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/site\/purchases"}]}},"\/jetpack\/v4\/site\/benefits":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/site\/benefits"}]}},"\/jetpack\/v4\/site\/activity":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/site\/activity"}]}},"\/jetpack\/v4\/module\/all":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/module\/all"}]}},"\/jetpack\/v4\/module\/all\/active":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"modules":{"default":"","type":"array","items":{"type":"string"},"required":true},"active":{"default":true,"type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/module\/all\/active"}]}},"\/jetpack\/v4\/module\/(?P<slug>[a-z\\-]+)":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"context":{"default":"edit","required":false},"jetpack_blocks_disabled":{"description":"Jetpack Blocks disabled.","type":"boolean","default":false,"required":false},"carousel_background_color":{"description":"Color scheme.","type":"string","default":"black","enum":["black","white"],"required":false},"carousel_display_exif":{"description":"Show photo metadata (<a href=\"https:\/\/en.wikipedia.org\/wiki\/Exchangeable_image_file_format\" target=\"_blank\">Exif<\/a>) in carousel, when available.","type":"boolean","default":0,"required":false},"carousel_display_comments":{"description":"Show comments area in carousel","type":"boolean","default":1,"required":false},"highlander_comment_form_prompt":{"description":"Greeting Text","type":"string","default":"Leave a Reply","required":false},"jetpack_comment_form_color_scheme":{"description":"Color scheme","type":"string","default":"light","enum":["light","dark","transparent"],"required":false},"jetpack_portfolio":{"description":"Enable or disable Jetpack portfolio post type.","type":"boolean","default":0,"required":false},"jetpack_portfolio_posts_per_page":{"description":"Number of entries to show at most in Portfolio pages.","type":"integer","default":10,"required":false},"jetpack_testimonial":{"description":"Enable or disable Jetpack testimonial post type.","type":"boolean","default":0,"required":false},"jetpack_testimonial_posts_per_page":{"description":"Number of entries to show at most in Testimonial pages.","type":"integer","default":10,"required":false},"jetpack_waf_automatic_rules":{"description":"Enable automatic rules - Protect your site against untrusted traffic sources with automatic security rules.","type":"boolean","default":false,"required":false},"jetpack_waf_ip_block_list_enabled":{"description":"Block list - Block a specific request IP.","type":"boolean","default":0,"required":false},"jetpack_waf_ip_block_list":{"description":"Blocked IP addresses","type":"string","default":"","required":false},"jetpack_waf_ip_allow_list_enabled":{"description":"Allow list - Allow a specific request IP.","type":"boolean","default":0,"required":false},"jetpack_waf_ip_allow_list":{"description":"Always allowed IP addresses","type":"string","default":"","required":false},"jetpack_waf_share_data":{"description":"Share basic data with Jetpack.","type":"boolean","default":0,"required":false},"jetpack_waf_share_debug_data":{"description":"Share detailed data with Jetpack.","type":"boolean","default":0,"required":false},"tiled_galleries":{"description":"Display all your gallery pictures in a cool mosaic.","type":"boolean","default":0,"required":false},"gravatar_disable_hovercards":{"description":"View people&#039;s profiles when you mouse over their Gravatars","type":"string","default":"enabled","enum":["enabled","disabled"],"required":false},"infinite_scroll":{"description":"To infinity and beyond","type":"boolean","default":1,"required":false},"infinite_scroll_google_analytics":{"description":"Use Google Analytics with Infinite Scroll","type":"boolean","default":0,"required":false},"wpl_default":{"description":"WordPress.com Likes are","type":"string","default":"on","enum":["on","off"],"required":false},"social_notifications_like":{"description":"Send email notification when someone likes a post","type":"boolean","default":1,"required":false},"wpcom_publish_comments_with_markdown":{"description":"Use Markdown for comments.","type":"boolean","default":0,"required":false},"wpcom_publish_posts_with_markdown":{"description":"Use Markdown for posts.","type":"boolean","default":0,"required":false},"monitor_receive_notifications":{"description":"Receive Monitor Email Notifications.","type":"boolean","default":0,"required":false},"post_by_email_address":{"description":"Email Address","type":"string","default":"noop","enum":["noop","create","regenerate","delete"],"required":false},"jetpack_protect_key":{"description":"Protect API key","type":"string","default":"","required":false},"jetpack_protect_global_whitelist":{"description":"Protect global IP allow list","type":"string","default":"","required":false},"sharing_services":{"description":"Enabled Services and those hidden behind a button","type":"object","default":{"visible":["facebook","x"],"hidden":[]},"required":false},"button_style":{"description":"Button Style","type":"string","default":"icon","enum":["icon-text","icon","text","official"],"required":false},"sharing_label":{"description":"Sharing Label","type":"string","default":"","required":false},"show":{"description":"Views where buttons are shown","type":"array","items":{"type":"string"},"default":["post"],"required":false},"jetpack-twitter-cards-site-tag":{"description":"The Twitter username of the owner of this site&#039;s domain.","type":"string","default":"","required":false},"sharedaddy_disable_resources":{"description":"Disable CSS and JS","type":"boolean","default":0,"required":false},"custom":{"description":"Custom sharing services added by user.","type":"object","default":{"sharing_name":"","sharing_url":"","sharing_icon":""},"required":false},"sharing_delete_service":{"description":"Delete custom sharing service.","type":"string","default":"","required":false},"jetpack_sso_require_two_step":{"description":"Require Two-Step Authentication","type":"boolean","default":false,"required":false},"jetpack_sso_match_by_email":{"description":"Match by Email","type":"boolean","default":1,"required":false},"stb_enabled":{"description":"Show a &lt;em&gt;&#039;follow blog&#039;&lt;\/em&gt; option in the comment form","type":"boolean","default":1,"required":false},"stc_enabled":{"description":"Show a &lt;em&gt;&#039;follow comments&#039;&lt;\/em&gt; option in the comment form","type":"boolean","default":1,"required":false},"wpcom_newsletter_categories":{"description":"Array of post category ids that are marked as newsletter categories","type":"array","default":[],"required":false},"wpcom_newsletter_categories_enabled":{"description":"Whether the newsletter categories are enabled or not","type":"boolean","default":0,"required":false},"wpcom_featured_image_in_email":{"description":"Whether to include the featured image in the email or not","type":"boolean","default":0,"required":false},"jetpack_gravatar_in_email":{"description":"Whether to show author avatar in the email byline","type":"boolean","default":1,"required":false},"jetpack_author_in_email":{"description":"Whether to show author display name in the email byline","type":"boolean","default":1,"required":false},"jetpack_post_date_in_email":{"description":"Whether to show date in the email byline","type":"boolean","default":1,"required":false},"wpcom_subscription_emails_use_excerpt":{"description":"Whether to use the excerpt in the email or not","type":"boolean","default":0,"required":false},"jetpack_subscriptions_reply_to":{"description":"Reply to email behaviour for newsletters emails","type":"string","default":"comment","required":false},"jetpack_subscriptions_from_name":{"description":"From name for newsletters emails","type":"string","default":"","required":false},"sm_enabled":{"description":"Show popup Subscribe modal to readers.","type":"boolean","default":0,"required":false},"jetpack_subscribe_overlay_enabled":{"description":"Show subscribe overlay on homepage.","type":"boolean","default":0,"required":false},"jetpack_subscribe_floating_button_enabled":{"description":"Show a floating subscribe button.","type":"boolean","default":0,"required":false},"jetpack_subscriptions_subscribe_post_end_enabled":{"description":"Add Subscribe block at the end of each post.","type":"boolean","default":0,"required":false},"jetpack_subscriptions_login_navigation_enabled":{"description":"Add Subscriber Login block to the navigation.","type":"boolean","default":0,"required":false},"jetpack_subscriptions_subscribe_navigation_enabled":{"description":"Add Subscribe block to the navigation.","type":"boolean","default":0,"required":false},"social_notifications_subscribe":{"description":"Send email notification when someone subscribes to my blog","type":"boolean","default":0,"required":false},"subscription_options":{"description":"Three options used in subscription email templates: &#039;invitation&#039;, &#039;welcome&#039; and &#039;comment_follow&#039;.","type":"object","default":{"invitation":"","welcome":"","comment_follow":""},"required":false},"show_headline":{"description":"Highlight related content with a heading","type":"boolean","default":1,"required":false},"show_thumbnails":{"description":"Show a thumbnail image where available","type":"boolean","default":0,"required":false},"instant_search_enabled":{"description":"Enable Instant Search","type":"boolean","default":0,"required":false},"has_jetpack_search_product":{"description":"Has an active Jetpack Search product purchase","type":"boolean","default":0,"required":false},"search_auto_config":{"description":"Trigger an auto config of instant search","type":"boolean","default":0,"required":false},"google":{"description":"Google Search Console","type":"string","default":"","required":false},"bing":{"description":"Bing Webmaster Center","type":"string","default":"","required":false},"pinterest":{"description":"Pinterest Site Verification","type":"string","default":"","required":false},"yandex":{"description":"Yandex Site Verification","type":"string","default":"","required":false},"facebook":{"description":"Facebook Domain Verification","type":"string","default":"","required":false},"enable_header_ad":{"description":"Display an ad unit at the top of each page.","type":"boolean","default":1,"required":false},"wordads_approved":{"description":"Is site approved for WordAds?","type":"boolean","default":0,"required":false},"wordads_second_belowpost":{"description":"Display second ad below post?","type":"boolean","default":1,"required":false},"wordads_inline_enabled":{"description":"Display inline ad within post content?","type":"boolean","default":1,"required":false},"wordads_display_front_page":{"description":"Display ads on the front page?","type":"boolean","default":1,"required":false},"wordads_display_post":{"description":"Display ads on posts?","type":"boolean","default":1,"required":false},"wordads_display_page":{"description":"Display ads on pages?","type":"boolean","default":1,"required":false},"wordads_display_archive":{"description":"Display ads on archive pages?","type":"boolean","default":1,"required":false},"wordads_custom_adstxt_enabled":{"description":"Custom ads.txt","type":"boolean","default":0,"required":false},"wordads_custom_adstxt":{"description":"Custom ads.txt entries","type":"string","default":"","required":false},"wordads_ccpa_enabled":{"description":"Enable support for California Consumer Privacy Act","type":"boolean","default":0,"required":false},"wordads_ccpa_privacy_policy_url":{"description":"Privacy Policy URL","type":"string","default":"","required":false},"wordads_cmp_enabled":{"description":"Enable GDPR Consent Management Banner for WordAds","type":"boolean","default":0,"required":false},"google_analytics_tracking_id":{"description":"Google Analytics","type":"string","default":"","required":false},"jetpack_wga":{"description":"Google Analytics","type":"object","required":false},"admin_bar":{"description":"Include a small chart in your admin bar with a 48-hour traffic snapshot.","type":"boolean","default":1,"required":false},"enable_odyssey_stats":{"description":"Preview the new Jetpack Stats experience (Experimental).","type":"boolean","default":1,"required":false},"roles":{"description":"Select the roles that will be able to view stats reports.","type":"array","items":{"type":"string"},"default":["administrator"],"required":false},"count_roles":{"description":"Count the page views of registered users who are logged in.","type":"array","items":{"type":"string"},"default":["administrator"],"required":false},"blog_id":{"description":"Blog ID.","type":"boolean","default":0,"required":false},"do_not_track":{"description":"Do not track.","type":"boolean","default":1,"required":false},"version":{"description":"Version.","type":"integer","default":9,"required":false},"collapse_nudges":{"description":"Collapse upgrade nudges","type":"boolean","default":0,"required":false},"wpcom_reader_views_enabled":{"description":"Show post views in the WordPress.com Reader.","type":"boolean","default":1,"required":false},"akismet_show_user_comments_approved":{"description":"","type":"boolean","default":0,"required":false},"wordpress_api_key":{"description":"","type":"string","default":"","required":false},"dismiss_empty_stats_card":{"description":"","type":"boolean","default":0,"required":false},"dismiss_dash_backup_getting_started":{"description":"","type":"boolean","default":0,"required":false},"dismiss_dash_agencies_learn_more":{"description":"","type":"boolean","default":0,"required":false},"lang_id":{"description":"Primary language for the site.","type":"string","default":"en_US","required":false},"advanced_seo_front_page_description":{"description":"Front page meta description.","type":"string","default":"","required":false},"advanced_seo_title_formats":{"description":"SEO page title structures.","type":"object","default":{"archives":[],"front_page":[],"groups":[],"pages":[],"posts":[]},"required":false},"videopress_private_enabled_for_site":{"description":"Video Privacy: Restrict views to members of this site","type":"boolean","default":0,"required":false},"ai_seo_enhancer_enabled":{"description":"Automatically generate SEO title, SEO description, and image alt text for new posts.","type":"boolean","default":0,"required":false},"account-protection":{"description":"","type":"boolean","default":0,"required":false},"blaze":{"description":"","type":"boolean","default":0,"required":false},"blocks":{"description":"","type":"boolean","default":0,"required":false},"canonical-urls":{"description":"","type":"boolean","default":0,"required":false},"carousel":{"description":"","type":"boolean","default":0,"required":false},"comment-likes":{"description":"","type":"boolean","default":0,"required":false},"comments":{"description":"","type":"boolean","default":0,"required":false},"contact-form":{"description":"","type":"boolean","default":0,"required":false},"copy-post":{"description":"","type":"boolean","default":0,"required":false},"custom-content-types":{"description":"","type":"boolean","default":0,"required":false},"google-fonts":{"description":"","type":"boolean","default":0,"required":false},"gravatar-hovercards":{"description":"","type":"boolean","default":0,"required":false},"infinite-scroll":{"description":"","type":"boolean","default":0,"required":false},"json-api":{"description":"","type":"boolean","default":0,"required":false},"latex":{"description":"","type":"boolean","default":0,"required":false},"likes":{"description":"","type":"boolean","default":0,"required":false},"markdown":{"description":"","type":"boolean","default":0,"required":false},"monitor":{"description":"","type":"boolean","default":0,"required":false},"notes":{"description":"","type":"boolean","default":0,"required":false},"photon-cdn":{"description":"","type":"boolean","default":0,"required":false},"photon":{"description":"","type":"boolean","default":0,"required":false},"post-by-email":{"description":"","type":"boolean","default":0,"required":false},"post-list":{"description":"","type":"boolean","default":0,"required":false},"protect":{"description":"","type":"boolean","default":0,"required":false},"publicize":{"description":"","type":"boolean","default":0,"required":false},"related-posts":{"description":"","type":"boolean","default":0,"required":false},"search":{"description":"","type":"boolean","default":0,"required":false},"seo-tools":{"description":"","type":"boolean","default":0,"required":false},"sharedaddy":{"description":"","type":"boolean","default":0,"required":false},"shortcodes":{"description":"","type":"boolean","default":0,"required":false},"shortlinks":{"description":"","type":"boolean","default":0,"required":false},"sitemaps":{"description":"","type":"boolean","default":0,"required":false},"sso":{"description":"","type":"boolean","default":0,"required":false},"stats":{"description":"","type":"boolean","default":0,"required":false},"subscriptions":{"description":"","type":"boolean","default":0,"required":false},"tiled-gallery":{"description":"","type":"boolean","default":0,"required":false},"vaultpress":{"description":"","type":"boolean","default":0,"required":false},"verification-tools":{"description":"","type":"boolean","default":0,"required":false},"videopress":{"description":"","type":"boolean","default":0,"required":false},"waf":{"description":"","type":"boolean","default":0,"required":false},"widget-visibility":{"description":"","type":"boolean","default":0,"required":false},"widgets":{"description":"","type":"boolean","default":0,"required":false},"woocommerce-analytics":{"description":"","type":"boolean","default":0,"required":false},"wordads":{"description":"","type":"boolean","default":0,"required":false},"wpcom-reader":{"description":"","type":"boolean","default":0,"required":false}}}]},"\/jetpack\/v4\/module\/(?P<slug>[a-z\\-]+)\/active":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"active":{"default":true,"type":"boolean","required":true}}}]},"\/jetpack\/v4\/module\/(?P<slug>[a-z\\-]+)\/data":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"range":{"default":"day","type":"string","required":false}}}]},"\/jetpack\/v4\/module\/(?P<service>[a-z\\-]+)\/key\/check":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"api_key":{"default":"","type":"string","required":false}}}]},"\/jetpack\/v4\/settings":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH","GET"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"context":{"default":"edit","required":false},"jetpack_blocks_disabled":{"description":"Jetpack Blocks disabled.","type":"boolean","default":false,"required":false},"carousel_background_color":{"description":"Color scheme.","type":"string","default":"black","enum":["black","white"],"required":false},"carousel_display_exif":{"description":"Show photo metadata (<a href=\"https:\/\/en.wikipedia.org\/wiki\/Exchangeable_image_file_format\" target=\"_blank\">Exif<\/a>) in carousel, when available.","type":"boolean","default":0,"required":false},"carousel_display_comments":{"description":"Show comments area in carousel","type":"boolean","default":1,"required":false},"highlander_comment_form_prompt":{"description":"Greeting Text","type":"string","default":"Leave a Reply","required":false},"jetpack_comment_form_color_scheme":{"description":"Color scheme","type":"string","default":"light","enum":["light","dark","transparent"],"required":false},"jetpack_portfolio":{"description":"Enable or disable Jetpack portfolio post type.","type":"boolean","default":0,"required":false},"jetpack_portfolio_posts_per_page":{"description":"Number of entries to show at most in Portfolio pages.","type":"integer","default":10,"required":false},"jetpack_testimonial":{"description":"Enable or disable Jetpack testimonial post type.","type":"boolean","default":0,"required":false},"jetpack_testimonial_posts_per_page":{"description":"Number of entries to show at most in Testimonial pages.","type":"integer","default":10,"required":false},"jetpack_waf_automatic_rules":{"description":"Enable automatic rules - Protect your site against untrusted traffic sources with automatic security rules.","type":"boolean","default":false,"required":false},"jetpack_waf_ip_block_list_enabled":{"description":"Block list - Block a specific request IP.","type":"boolean","default":0,"required":false},"jetpack_waf_ip_block_list":{"description":"Blocked IP addresses","type":"string","default":"","required":false},"jetpack_waf_ip_allow_list_enabled":{"description":"Allow list - Allow a specific request IP.","type":"boolean","default":0,"required":false},"jetpack_waf_ip_allow_list":{"description":"Always allowed IP addresses","type":"string","default":"","required":false},"jetpack_waf_share_data":{"description":"Share basic data with Jetpack.","type":"boolean","default":0,"required":false},"jetpack_waf_share_debug_data":{"description":"Share detailed data with Jetpack.","type":"boolean","default":0,"required":false},"tiled_galleries":{"description":"Display all your gallery pictures in a cool mosaic.","type":"boolean","default":0,"required":false},"gravatar_disable_hovercards":{"description":"View people&#039;s profiles when you mouse over their Gravatars","type":"string","default":"enabled","enum":["enabled","disabled"],"required":false},"infinite_scroll":{"description":"To infinity and beyond","type":"boolean","default":1,"required":false},"infinite_scroll_google_analytics":{"description":"Use Google Analytics with Infinite Scroll","type":"boolean","default":0,"required":false},"wpl_default":{"description":"WordPress.com Likes are","type":"string","default":"on","enum":["on","off"],"required":false},"social_notifications_like":{"description":"Send email notification when someone likes a post","type":"boolean","default":1,"required":false},"wpcom_publish_comments_with_markdown":{"description":"Use Markdown for comments.","type":"boolean","default":0,"required":false},"wpcom_publish_posts_with_markdown":{"description":"Use Markdown for posts.","type":"boolean","default":0,"required":false},"monitor_receive_notifications":{"description":"Receive Monitor Email Notifications.","type":"boolean","default":0,"required":false},"post_by_email_address":{"description":"Email Address","type":"string","default":"noop","enum":["noop","create","regenerate","delete"],"required":false},"jetpack_protect_key":{"description":"Protect API key","type":"string","default":"","required":false},"jetpack_protect_global_whitelist":{"description":"Protect global IP allow list","type":"string","default":"","required":false},"sharing_services":{"description":"Enabled Services and those hidden behind a button","type":"object","default":{"visible":["facebook","x"],"hidden":[]},"required":false},"button_style":{"description":"Button Style","type":"string","default":"icon","enum":["icon-text","icon","text","official"],"required":false},"sharing_label":{"description":"Sharing Label","type":"string","default":"","required":false},"show":{"description":"Views where buttons are shown","type":"array","items":{"type":"string"},"default":["post"],"required":false},"jetpack-twitter-cards-site-tag":{"description":"The Twitter username of the owner of this site&#039;s domain.","type":"string","default":"","required":false},"sharedaddy_disable_resources":{"description":"Disable CSS and JS","type":"boolean","default":0,"required":false},"custom":{"description":"Custom sharing services added by user.","type":"object","default":{"sharing_name":"","sharing_url":"","sharing_icon":""},"required":false},"sharing_delete_service":{"description":"Delete custom sharing service.","type":"string","default":"","required":false},"jetpack_sso_require_two_step":{"description":"Require Two-Step Authentication","type":"boolean","default":false,"required":false},"jetpack_sso_match_by_email":{"description":"Match by Email","type":"boolean","default":1,"required":false},"stb_enabled":{"description":"Show a &lt;em&gt;&#039;follow blog&#039;&lt;\/em&gt; option in the comment form","type":"boolean","default":1,"required":false},"stc_enabled":{"description":"Show a &lt;em&gt;&#039;follow comments&#039;&lt;\/em&gt; option in the comment form","type":"boolean","default":1,"required":false},"wpcom_newsletter_categories":{"description":"Array of post category ids that are marked as newsletter categories","type":"array","default":[],"required":false},"wpcom_newsletter_categories_enabled":{"description":"Whether the newsletter categories are enabled or not","type":"boolean","default":0,"required":false},"wpcom_featured_image_in_email":{"description":"Whether to include the featured image in the email or not","type":"boolean","default":0,"required":false},"jetpack_gravatar_in_email":{"description":"Whether to show author avatar in the email byline","type":"boolean","default":1,"required":false},"jetpack_author_in_email":{"description":"Whether to show author display name in the email byline","type":"boolean","default":1,"required":false},"jetpack_post_date_in_email":{"description":"Whether to show date in the email byline","type":"boolean","default":1,"required":false},"wpcom_subscription_emails_use_excerpt":{"description":"Whether to use the excerpt in the email or not","type":"boolean","default":0,"required":false},"jetpack_subscriptions_reply_to":{"description":"Reply to email behaviour for newsletters emails","type":"string","default":"comment","required":false},"jetpack_subscriptions_from_name":{"description":"From name for newsletters emails","type":"string","default":"","required":false},"sm_enabled":{"description":"Show popup Subscribe modal to readers.","type":"boolean","default":0,"required":false},"jetpack_subscribe_overlay_enabled":{"description":"Show subscribe overlay on homepage.","type":"boolean","default":0,"required":false},"jetpack_subscribe_floating_button_enabled":{"description":"Show a floating subscribe button.","type":"boolean","default":0,"required":false},"jetpack_subscriptions_subscribe_post_end_enabled":{"description":"Add Subscribe block at the end of each post.","type":"boolean","default":0,"required":false},"jetpack_subscriptions_login_navigation_enabled":{"description":"Add Subscriber Login block to the navigation.","type":"boolean","default":0,"required":false},"jetpack_subscriptions_subscribe_navigation_enabled":{"description":"Add Subscribe block to the navigation.","type":"boolean","default":0,"required":false},"social_notifications_subscribe":{"description":"Send email notification when someone subscribes to my blog","type":"boolean","default":0,"required":false},"subscription_options":{"description":"Three options used in subscription email templates: &#039;invitation&#039;, &#039;welcome&#039; and &#039;comment_follow&#039;.","type":"object","default":{"invitation":"","welcome":"","comment_follow":""},"required":false},"show_headline":{"description":"Highlight related content with a heading","type":"boolean","default":1,"required":false},"show_thumbnails":{"description":"Show a thumbnail image where available","type":"boolean","default":0,"required":false},"instant_search_enabled":{"description":"Enable Instant Search","type":"boolean","default":0,"required":false},"has_jetpack_search_product":{"description":"Has an active Jetpack Search product purchase","type":"boolean","default":0,"required":false},"search_auto_config":{"description":"Trigger an auto config of instant search","type":"boolean","default":0,"required":false},"google":{"description":"Google Search Console","type":"string","default":"","required":false},"bing":{"description":"Bing Webmaster Center","type":"string","default":"","required":false},"pinterest":{"description":"Pinterest Site Verification","type":"string","default":"","required":false},"yandex":{"description":"Yandex Site Verification","type":"string","default":"","required":false},"facebook":{"description":"Facebook Domain Verification","type":"string","default":"","required":false},"enable_header_ad":{"description":"Display an ad unit at the top of each page.","type":"boolean","default":1,"required":false},"wordads_approved":{"description":"Is site approved for WordAds?","type":"boolean","default":0,"required":false},"wordads_second_belowpost":{"description":"Display second ad below post?","type":"boolean","default":1,"required":false},"wordads_inline_enabled":{"description":"Display inline ad within post content?","type":"boolean","default":1,"required":false},"wordads_display_front_page":{"description":"Display ads on the front page?","type":"boolean","default":1,"required":false},"wordads_display_post":{"description":"Display ads on posts?","type":"boolean","default":1,"required":false},"wordads_display_page":{"description":"Display ads on pages?","type":"boolean","default":1,"required":false},"wordads_display_archive":{"description":"Display ads on archive pages?","type":"boolean","default":1,"required":false},"wordads_custom_adstxt_enabled":{"description":"Custom ads.txt","type":"boolean","default":0,"required":false},"wordads_custom_adstxt":{"description":"Custom ads.txt entries","type":"string","default":"","required":false},"wordads_ccpa_enabled":{"description":"Enable support for California Consumer Privacy Act","type":"boolean","default":0,"required":false},"wordads_ccpa_privacy_policy_url":{"description":"Privacy Policy URL","type":"string","default":"","required":false},"wordads_cmp_enabled":{"description":"Enable GDPR Consent Management Banner for WordAds","type":"boolean","default":0,"required":false},"google_analytics_tracking_id":{"description":"Google Analytics","type":"string","default":"","required":false},"jetpack_wga":{"description":"Google Analytics","type":"object","required":false},"admin_bar":{"description":"Include a small chart in your admin bar with a 48-hour traffic snapshot.","type":"boolean","default":1,"required":false},"enable_odyssey_stats":{"description":"Preview the new Jetpack Stats experience (Experimental).","type":"boolean","default":1,"required":false},"roles":{"description":"Select the roles that will be able to view stats reports.","type":"array","items":{"type":"string"},"default":["administrator"],"required":false},"count_roles":{"description":"Count the page views of registered users who are logged in.","type":"array","items":{"type":"string"},"default":["administrator"],"required":false},"blog_id":{"description":"Blog ID.","type":"boolean","default":0,"required":false},"do_not_track":{"description":"Do not track.","type":"boolean","default":1,"required":false},"version":{"description":"Version.","type":"integer","default":9,"required":false},"collapse_nudges":{"description":"Collapse upgrade nudges","type":"boolean","default":0,"required":false},"wpcom_reader_views_enabled":{"description":"Show post views in the WordPress.com Reader.","type":"boolean","default":1,"required":false},"akismet_show_user_comments_approved":{"description":"","type":"boolean","default":0,"required":false},"wordpress_api_key":{"description":"","type":"string","default":"","required":false},"dismiss_empty_stats_card":{"description":"","type":"boolean","default":0,"required":false},"dismiss_dash_backup_getting_started":{"description":"","type":"boolean","default":0,"required":false},"dismiss_dash_agencies_learn_more":{"description":"","type":"boolean","default":0,"required":false},"lang_id":{"description":"Primary language for the site.","type":"string","default":"en_US","required":false},"advanced_seo_front_page_description":{"description":"Front page meta description.","type":"string","default":"","required":false},"advanced_seo_title_formats":{"description":"SEO page title structures.","type":"object","default":{"archives":[],"front_page":[],"groups":[],"pages":[],"posts":[]},"required":false},"videopress_private_enabled_for_site":{"description":"Video Privacy: Restrict views to members of this site","type":"boolean","default":0,"required":false},"ai_seo_enhancer_enabled":{"description":"Automatically generate SEO title, SEO description, and image alt text for new posts.","type":"boolean","default":0,"required":false},"account-protection":{"description":"","type":"boolean","default":0,"required":false},"blaze":{"description":"","type":"boolean","default":0,"required":false},"blocks":{"description":"","type":"boolean","default":0,"required":false},"canonical-urls":{"description":"","type":"boolean","default":0,"required":false},"carousel":{"description":"","type":"boolean","default":0,"required":false},"comment-likes":{"description":"","type":"boolean","default":0,"required":false},"comments":{"description":"","type":"boolean","default":0,"required":false},"contact-form":{"description":"","type":"boolean","default":0,"required":false},"copy-post":{"description":"","type":"boolean","default":0,"required":false},"custom-content-types":{"description":"","type":"boolean","default":0,"required":false},"google-fonts":{"description":"","type":"boolean","default":0,"required":false},"gravatar-hovercards":{"description":"","type":"boolean","default":0,"required":false},"infinite-scroll":{"description":"","type":"boolean","default":0,"required":false},"json-api":{"description":"","type":"boolean","default":0,"required":false},"latex":{"description":"","type":"boolean","default":0,"required":false},"likes":{"description":"","type":"boolean","default":0,"required":false},"markdown":{"description":"","type":"boolean","default":0,"required":false},"monitor":{"description":"","type":"boolean","default":0,"required":false},"notes":{"description":"","type":"boolean","default":0,"required":false},"photon-cdn":{"description":"","type":"boolean","default":0,"required":false},"photon":{"description":"","type":"boolean","default":0,"required":false},"post-by-email":{"description":"","type":"boolean","default":0,"required":false},"post-list":{"description":"","type":"boolean","default":0,"required":false},"protect":{"description":"","type":"boolean","default":0,"required":false},"publicize":{"description":"","type":"boolean","default":0,"required":false},"related-posts":{"description":"","type":"boolean","default":0,"required":false},"search":{"description":"","type":"boolean","default":0,"required":false},"seo-tools":{"description":"","type":"boolean","default":0,"required":false},"sharedaddy":{"description":"","type":"boolean","default":0,"required":false},"shortcodes":{"description":"","type":"boolean","default":0,"required":false},"shortlinks":{"description":"","type":"boolean","default":0,"required":false},"sitemaps":{"description":"","type":"boolean","default":0,"required":false},"sso":{"description":"","type":"boolean","default":0,"required":false},"stats":{"description":"","type":"boolean","default":0,"required":false},"subscriptions":{"description":"","type":"boolean","default":0,"required":false},"tiled-gallery":{"description":"","type":"boolean","default":0,"required":false},"vaultpress":{"description":"","type":"boolean","default":0,"required":false},"verification-tools":{"description":"","type":"boolean","default":0,"required":false},"videopress":{"description":"","type":"boolean","default":0,"required":false},"waf":{"description":"","type":"boolean","default":0,"required":false},"widget-visibility":{"description":"","type":"boolean","default":0,"required":false},"widgets":{"description":"","type":"boolean","default":0,"required":false},"woocommerce-analytics":{"description":"","type":"boolean","default":0,"required":false},"wordads":{"description":"","type":"boolean","default":0,"required":false},"wpcom-reader":{"description":"","type":"boolean","default":0,"required":false}}},{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/settings"}]}},"\/jetpack\/v4\/settings\/(?P<slug>[a-z\\-]+)":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"context":{"default":"edit","required":false}}}]},"\/jetpack\/v4\/options\/(?P<options>[a-z\\-]+)":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/jetpack\/v4\/updates\/plugins":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/updates\/plugins"}]}},"\/jetpack\/v4\/notice\/(?P<notice>[a-z\\-_]+)":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/jetpack\/v4\/plugins":{"namespace":"jetpack\/v4","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","pattern":"[\\w\\-]+","required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active","network-active"],"default":"inactive","required":false},"source":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/plugins"}]}},"\/jetpack\/v4\/plugins\/(?P<plugin>[^.\\\/]+(?:\\\/[^.\\\/]+)?)":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"status":{"type":"string","required":true},"source":{"type":"string","required":false}}}]},"\/jetpack\/v4\/plugin\/(?P<plugin>[a-z\\\/\\.\\-_]+)":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/widgets\/(?P<id>[0-9a-z\\-_]+)":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/verify-site\/(?P<service>[a-z\\-_]+)":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"keyring_id":{"type":"integer","required":true}}}]},"\/jetpack\/v4\/verify-site\/(?P<service>[a-z\\-_]+)\/(?<keyring_id>[0-9]+)":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/recommendations\/data":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/recommendations\/data"}]}},"\/jetpack\/v4\/recommendations\/step":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"step":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/recommendations\/step"}]}},"\/jetpack\/v4\/recommendations\/product-suggestions":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/recommendations\/product-suggestions"}]}},"\/jetpack\/v4\/recommendations\/upsell":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/recommendations\/upsell"}]}},"\/jetpack\/v4\/recommendations\/conditional":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/recommendations\/conditional"}]}},"\/jetpack\/v4\/site\/discount":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/site\/discount"}]}},"\/jetpack\/v4\/jetpack_crm":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"extension":{"type":"text","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/jetpack_crm"}]}},"\/jetpack\/v4\/purchase-token":{"namespace":"jetpack\/v4","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/purchase-token"}]}},"\/jetpack\/v4\/seen-wc-connection-modal":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/seen-wc-connection-modal"}]}},"\/jetpack\/v4\/intro-offers":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/intro-offers"}]}},"\/jetpack\/v4\/subscribers\/auth":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"redirect_url":{"description":"The URL to redirect to.","type":"string","format":"uri","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/subscribers\/auth"}]}},"\/jetpack\/v4\/features\/available":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/features\/available"}]}},"\/jetpack\/v4\/features\/enabled":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/features\/enabled"}]}},"\/jetpack\/v4\/licensing\/error":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"error":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/licensing\/error"}]}},"\/jetpack\/v4\/licensing\/set-license":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"license":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/licensing\/set-license"}]}},"\/jetpack\/v4\/licensing\/user\/licenses":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/licensing\/user\/licenses"}]}},"\/jetpack\/v4\/licensing\/user\/counts":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/licensing\/user\/counts"}]}},"\/jetpack\/v4\/licensing\/user\/activation-notice-dismiss":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"last_detached_count":{"type":"integer","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/licensing\/user\/activation-notice-dismiss"}]}},"\/jetpack\/v4\/licensing\/attach-licenses":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"licenses":{"type":"array","items":{"type":"string"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/licensing\/attach-licenses"}]}},"\/mp\/v1":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"mp\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1"}]}},"\/mp\/v1\/memberships":{"namespace":"mp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":[]},{"methods":["POST"],"allow_batch":{"v1":true},"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/memberships"}]}},"\/mp\/v1\/memberships\/(?P<id>[\\d]+)":{"namespace":"mp\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["DELETE"],"args":{"force":{"default":false,"required":false}}}]},"\/mp\/v1\/memberships\/schema":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/memberships\/schema"}]}},"\/mp\/v1\/events":{"namespace":"mp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":[]},{"methods":["POST"],"allow_batch":{"v1":true},"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/events"}]}},"\/mp\/v1\/events\/(?P<id>[\\d]+)":{"namespace":"mp\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["DELETE"],"args":{"force":{"default":false,"required":false}}}]},"\/mp\/v1\/events\/schema":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/events\/schema"}]}},"\/mp\/v1\/quizzes":{"namespace":"mp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":[]},{"methods":["POST"],"allow_batch":{"v1":true},"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/quizzes"}]}},"\/mp\/v1\/quizzes\/(?P<id>[\\d]+)":{"namespace":"mp\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["DELETE"],"args":{"force":{"default":false,"required":false}}}]},"\/mp\/v1\/quizzes\/schema":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/quizzes\/schema"}]}},"\/mp\/v1\/quizzes\/(?P<id>[\\d]+)\/start":{"namespace":"mp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/mp\/v1\/quizzes\/(?P<id>[\\d]+)\/complete":{"namespace":"mp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/mp\/v1\/transactions":{"namespace":"mp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":[]},{"methods":["POST"],"allow_batch":{"v1":true},"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/transactions"}]}},"\/mp\/v1\/transactions\/(?P<id>[\\d]+)":{"namespace":"mp\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["DELETE"],"args":{"force":{"default":false,"required":false}}}]},"\/mp\/v1\/transactions\/schema":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/transactions\/schema"}]}},"\/mp\/v1\/transactions\/(?P<id>[\\d]+)\/refund":{"namespace":"mp\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/mp\/v1\/transactions\/(?P<id>[\\d]+)\/refund_and_cancel":{"namespace":"mp\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/mp\/v1\/courses":{"namespace":"mp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":[]},{"methods":["POST"],"allow_batch":{"v1":true},"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/courses"}]}},"\/mp\/v1\/courses\/(?P<id>[\\d]+)":{"namespace":"mp\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["DELETE"],"args":{"force":{"default":false,"required":false}}}]},"\/mp\/v1\/courses\/schema":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/courses\/schema"}]}},"\/mp\/v1\/courses\/settings":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/courses\/settings"}]}},"\/mp\/v1\/courses\/authors":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/courses\/authors"}]}},"\/mp\/v1\/courses\/(?P<id>[\\d]+)\/sections":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/mp\/v1\/courses\/(?P<id>[\\d]+)\/start":{"namespace":"mp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/mp\/v1\/courses\/(?P<id>[\\d]+)\/complete":{"namespace":"mp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/mp\/v1\/courses\/(?P<id>[\\d]+)\/comments":{"namespace":"mp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}]},"\/mp\/v1\/courses\/(?P<id>[\\d]+)\/comments\/(?P<comment_id>[\\d]+)\/reply":{"namespace":"mp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/mp\/v1\/courses\/(?P<id>[\\d]+)\/comments\/(?P<comment_id>[\\d]+)\/edit":{"namespace":"mp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/mp\/v1\/rules":{"namespace":"mp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":[]},{"methods":["POST"],"allow_batch":{"v1":true},"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/rules"}]}},"\/mp\/v1\/rules\/(?P<id>[\\d]+)":{"namespace":"mp\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["DELETE"],"args":{"force":{"default":false,"required":false}}}]},"\/mp\/v1\/rules\/schema":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/rules\/schema"}]}},"\/mp\/v1\/coupons":{"namespace":"mp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":[]},{"methods":["POST"],"allow_batch":{"v1":true},"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/coupons"}]}},"\/mp\/v1\/coupons\/(?P<id>[\\d]+)":{"namespace":"mp\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["DELETE"],"args":{"force":{"default":false,"required":false}}}]},"\/mp\/v1\/coupons\/schema":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/coupons\/schema"}]}},"\/mp\/v1\/groups":{"namespace":"mp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":[]},{"methods":["POST"],"allow_batch":{"v1":true},"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/groups"}]}},"\/mp\/v1\/groups\/(?P<id>[\\d]+)":{"namespace":"mp\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["DELETE"],"args":{"force":{"default":false,"required":false}}}]},"\/mp\/v1\/groups\/schema":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/groups\/schema"}]}},"\/mp\/v1\/members":{"namespace":"mp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":[]},{"methods":["POST"],"allow_batch":{"v1":true},"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/members"}]}},"\/mp\/v1\/members\/(?P<id>[\\d]+)":{"namespace":"mp\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["DELETE"],"args":{"force":{"default":false,"required":false}}}]},"\/mp\/v1\/members\/schema":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/members\/schema"}]}},"\/mp\/v1\/me":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/me"}]}},"\/mp\/v1\/validate-login":{"namespace":"mp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/validate-login"}]}},"\/mp\/v1\/webhooks\/subscribe":{"namespace":"mp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/webhooks\/subscribe"}]}},"\/mp\/v1\/events\/poll":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/events\/poll"}]}},"\/mp\/v1\/webhooks\/unsubscribe\/(?P<id>[\\d]+)":{"namespace":"mp\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}]},"\/mp\/v1\/subscriptions":{"namespace":"mp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":[]},{"methods":["POST"],"allow_batch":{"v1":true},"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/subscriptions"}]}},"\/mp\/v1\/subscriptions\/(?P<id>[\\d]+)":{"namespace":"mp\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["DELETE"],"args":{"force":{"default":false,"required":false}}}]},"\/mp\/v1\/subscriptions\/schema":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/subscriptions\/schema"}]}},"\/mp\/v1\/subscriptions\/(?P<id>[\\d]+)\/cancel":{"namespace":"mp\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/mp\/v1\/subscriptions\/(?P<id>[\\d]+)\/expire":{"namespace":"mp\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/mp\/v1\/lessons":{"namespace":"mp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":[]},{"methods":["POST"],"allow_batch":{"v1":true},"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/lessons"}]}},"\/mp\/v1\/lessons\/(?P<id>[\\d]+)":{"namespace":"mp\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["DELETE"],"args":{"force":{"default":false,"required":false}}}]},"\/mp\/v1\/lessons\/schema":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/lessons\/schema"}]}},"\/mp\/v1\/lessons\/(?P<id>[\\d]+)\/start":{"namespace":"mp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/mp\/v1\/lessons\/(?P<id>[\\d]+)\/complete":{"namespace":"mp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/mp\/v1\/lessons\/(?P<id>[\\d]+)\/comments":{"namespace":"mp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}]},"\/mp\/v1\/lessons\/(?P<id>[\\d]+)\/comments\/(?P<comment_id>[\\d]+)\/reply":{"namespace":"mp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/mp\/v1\/lessons\/(?P<id>[\\d]+)\/comments\/(?P<comment_id>[\\d]+)\/edit":{"namespace":"mp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/mp\/v1\/reminders":{"namespace":"mp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":[]},{"methods":["POST"],"allow_batch":{"v1":true},"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/reminders"}]}},"\/mp\/v1\/reminders\/(?P<id>[\\d]+)":{"namespace":"mp\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["DELETE"],"args":{"force":{"default":false,"required":false}}}]},"\/mp\/v1\/reminders\/schema":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/reminders\/schema"}]}},"\/mp\/v1\/assignments":{"namespace":"mp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":[]},{"methods":["POST"],"allow_batch":{"v1":true},"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/assignments"}]}},"\/mp\/v1\/assignments\/(?P<id>[\\d]+)":{"namespace":"mp\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["DELETE"],"args":{"force":{"default":false,"required":false}}}]},"\/mp\/v1\/assignments\/schema":{"namespace":"mp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mp\/v1\/assignments\/schema"}]}},"\/mp\/v1\/assignments\/(?P<id>[\\d]+)\/start":{"namespace":"mp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/mp\/v1\/assignments\/(?P<id>[\\d]+)\/complete":{"namespace":"mp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/mp\/v1\/assignments\/(?P<id>[\\d]+)\/submissions\/(?P<user_id>[\\d]+)":{"namespace":"mp\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}]},"\/mpdl":{"namespace":"mpdl","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"mpdl","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mpdl"}]}},"\/mpdl\/downloads\/files":{"namespace":"mpdl","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/mpdl\/downloads\/files"}]}},"\/tribe\/v1":{"namespace":"tribe\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"tribe\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/tribe\/v1"}]}},"\/tribe\/v1\/stream\/watched\/(?P<video_id>\\d+)":{"namespace":"tribe\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"video_id":{"type":"integer","required":true}}}]},"\/bwz\/v1":{"namespace":"bwz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"bwz\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/bwz\/v1"}]}},"\/bwz\/v1\/custom-posts-data":{"namespace":"bwz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/bwz\/v1\/custom-posts-data"}]}},"\/bwz\/v1\/clear-cache":{"namespace":"bwz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/bwz\/v1\/clear-cache"}]}},"\/bwz\/v1\/clear-page-cache":{"namespace":"bwz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/bwz\/v1\/clear-page-cache"}]}},"\/bwz\/v1\/edit-post":{"namespace":"bwz\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/bwz\/v1\/edit-post"}]}},"\/bwz\/v1\/edit-post\/featured-image":{"namespace":"bwz\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/bwz\/v1\/edit-post\/featured-image"}]}},"\/bwz\/v1\/generate-featured-image":{"namespace":"bwz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/bwz\/v1\/generate-featured-image"}]}},"\/bwz\/v1\/membership-data":{"namespace":"bwz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/bwz\/v1\/membership-data"}]}},"\/bwz\/v1\/tools-post-data":{"namespace":"bwz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/bwz\/v1\/tools-post-data"}]}},"\/bwz\/v1\/get-translations":{"namespace":"bwz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/bwz\/v1\/get-translations"}]}},"\/bwz\/v1\/update-post-modified-date":{"namespace":"bwz\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/bwz\/v1\/update-post-modified-date"}]}},"\/bwz\/v1\/create-ssl-provider":{"namespace":"bwz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/bwz\/v1\/create-ssl-provider"}]}},"\/bwz\/v1\/update-ssl-provider":{"namespace":"bwz\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/bwz\/v1\/update-ssl-provider"}]}},"\/pll\/v1":{"namespace":"pll\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"pll\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/pll\/v1"}]}},"\/pll\/v1\/untranslated-posts":{"namespace":"pll\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"description":"Limit results to items of an object type.","type":"string","enum":["post","page","wp_block","attachment","tribe_media","partner_spotlight","tribe_service_post","tribe_stream","tribe_tool_post","tribe_download","wp_navigation"],"required":true},"untranslated_in":{"description":"Limit results to untranslated items in a language.","type":"string","enum":["en","es","de","fr"],"required":true},"lang":{"description":"Limit results to items in a language.","type":"string","enum":["en","es","de","fr"],"required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["edit"],"required":true},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"include":{"description":"Add this post's translation to results.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/pll\/v1\/untranslated-posts"}]}},"\/pll\/v1\/languages":{"namespace":"pll\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":[]},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"name":{"description":"The name is how it is displayed on your site (for example: English).","type":"string","minLength":1,"required":false},"slug":{"description":"Language code - preferably 2-letters ISO 639-1 (for example: en).","type":"string","pattern":"^[a-z][a-z0-9_-]*$","required":false},"locale":{"description":"WordPress Locale for the language (for example: en_US).","type":"string","pattern":"^[a-z]{2,3}(?:_[A-Z]{2})?(?:_[a-z0-9]+)?$","required":true},"is_rtl":{"description":"Text direction. `true` for right-to-left.","type":"boolean","required":false},"term_group":{"description":"Position of the language in the language switcher.","type":"integer","required":false},"flag_code":{"description":"Flag code corresponding to ISO 3166-1 (for example: us for the United States flag).","type":"string","required":false},"no_default_cat":{"default":false,"description":"Tells whether the default category must be created when creating a new language.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/pll\/v1\/languages"}]}},"\/pll\/v1\/languages\/(?P<term_id>[\\d]+)":{"namespace":"pll\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"term_id":{"description":"Unique identifier for the language.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"term_id":{"description":"Unique identifier for the language.","type":"integer","required":false},"name":{"description":"The name is how it is displayed on your site (for example: English).","type":"string","minLength":1,"required":false},"slug":{"description":"Language code - preferably 2-letters ISO 639-1 (for example: en).","type":"string","pattern":"^[a-z][a-z0-9_-]*$","required":false},"locale":{"description":"WordPress Locale for the language (for example: en_US).","type":"string","pattern":"^[a-z]{2,3}(?:_[A-Z]{2})?(?:_[a-z0-9]+)?$","required":false},"is_rtl":{"description":"Text direction. `true` for right-to-left.","type":"boolean","required":false},"term_group":{"description":"Position of the language in the language switcher.","type":"integer","required":false},"flag_code":{"description":"Flag code corresponding to ISO 3166-1 (for example: us for the United States flag).","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"term_id":{"description":"Unique identifier for the language.","type":"integer","required":false}}}]},"\/pll\/v1\/languages\/(?P<slug>[a-z][a-z0-9_-]*)":{"namespace":"pll\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"slug":{"description":"Language code - preferably 2-letters ISO 639-1 (for example: en).","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false}}}]},"\/pll\/v1\/settings":{"namespace":"pll\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":[]},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"browser":{"description":"Detect preferred browser language on front page: `true` to detect, `false` to not detect.","type":"boolean","required":false},"rewrite":{"description":"Remove `\/language\/` in pretty permalinks: `true` to remove, `false` to keep.","type":"boolean","required":false},"hide_default":{"description":"Remove the language code in URL for the default language: `true` to hide, `false` to display.","type":"boolean","required":false},"force_lang":{"description":"Determine how the current language is defined.","type":"integer","enum":[1,2,3],"required":false},"redirect_lang":{"description":"Remove the page name or page ID from the URL of the front page: `true` to remove, `false` to keep.","type":"boolean","required":false},"media_support":{"description":"Translate media: `true` to translate, `false` otherwise.","type":"boolean","required":false},"sync":{"description":"List of data to synchronize.","type":"array","items":{"type":"string","enum":["taxonomies","post_meta","comment_status","ping_status","sticky_posts","post_date","post_format","post_parent","_wp_page_template","menu_order","_thumbnail_id"]},"required":false},"post_types":{"description":"List of post types to translate.","type":"array","items":{"type":"string"},"required":false},"taxonomies":{"description":"List of taxonomies to translate.","type":"array","items":{"type":"string"},"required":false},"domains":{"description":"Domains used when the language is set from different domains.","type":"object","additionalProperties":false,"patternProperties":{"^[a-z][a-z0-9_-]*$":{"type":"string","format":"uri"}},"required":false},"default_lang":{"description":"Slug of the default language.","type":"string","pattern":"^[a-z][a-z0-9_-]*$","required":false},"nav_menus":{"description":"Translated navigation menus for each theme.","type":"object","additionalProperties":false,"patternProperties":{"[^\\\/:<>\\*\\?\"\\|]+":{"type":"object","patternProperties":{"[\\w-]+":{"type":"object","patternProperties":{"^[a-z][a-z0-9_-]*$":{"type":"integer","minimum":0}},"additionalProperties":false}},"additionalProperties":false}},"required":false},"language_taxonomies":{"description":"List of language taxonomies used for custom DB tables.","type":"array","items":{"type":"string"},"required":false},"media":{"description":"Automatically duplicate media in all languages when uploading a new file.","type":"object","properties":{"duplicate":{"type":"boolean","required":true}},"additionalProperties":false,"required":false},"machine_translation_enabled":{"description":"Enable machine translation.","type":"boolean","required":false},"machine_translation_services":{"description":"Settings for machine translation services: DeepL's API key and formality for now.","type":"object","properties":{"deepl":{"type":"object","properties":{"api_key":{"type":"string"},"formality":{"type":"string","enum":["default","prefer_more","prefer_less"]}},"additionalProperties":false}},"additionalProperties":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/pll\/v1\/settings"}]}},"\/jetpack\/v4\/verify_xmlrpc_error":{"namespace":"jetpack\/v4","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"nonce":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/verify_xmlrpc_error"}]}},"\/jetpack\/v4\/heartbeat\/data":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"prefix":{"description":"Prefix to add before the stats identifiers.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/heartbeat\/data"}]}},"\/jetpack\/v4\/sync\/full-sync":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"modules":{"description":"Data Modules that should be included in Full Sync","type":"array","required":false},"users":{"description":"User IDs to include in Full Sync or \"initial\"","required":false},"posts":{"description":"Post IDs to include in Full Sync","type":"array","required":false},"comments":{"description":"Comment IDs to include in Full Sync","type":"array","required":false},"context":{"description":"Context for the Full Sync","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/sync\/full-sync"}]}},"\/jetpack\/v4\/sync\/status":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"fields":{"description":"Comma-separated list of additional fields that should be included in status.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/sync\/status"}]}},"\/jetpack\/v4\/sync\/health":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"status":{"description":"New Sync health status","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/sync\/health"}]}},"\/jetpack\/v4\/sync\/settings":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/sync\/settings"}]}},"\/jetpack\/v4\/sync\/object":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"module_name":{"description":"Name of Sync module","type":"string","required":false},"object_type":{"description":"Object Type","type":"string","required":false},"object_ids":{"description":"Objects Identifiers","type":"array","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/sync\/object"}]}},"\/jetpack\/v4\/sync\/now":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"queue":{"description":"Name of Sync queue.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/sync\/now"}]}},"\/jetpack\/v4\/sync\/checkout":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/sync\/checkout"}]}},"\/jetpack\/v4\/sync\/close":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/sync\/close"}]}},"\/jetpack\/v4\/sync\/unlock":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"queue":{"description":"Name of Sync queue.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/sync\/unlock"}]}},"\/jetpack\/v4\/sync\/object-id-range":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"sync_module":{"description":"Name of Sync module.","type":"string","required":true},"batch_size":{"description":"Size of batches","type":"int","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/sync\/object-id-range"}]}},"\/jetpack\/v4\/sync\/data-check":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"perform_text_conversion":{"description":"If text fields should be converted to latin1 in checksum calculation.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/sync\/data-check"}]}},"\/jetpack\/v4\/sync\/data-histogram":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"columns":{"description":"Column mappings","type":"array","required":false},"object_type":{"description":"Object Type","type":"string","required":false},"buckets":{"description":"Number of histogram buckets.","type":"int","required":false},"start_id":{"description":"Start ID for the histogram","type":"int","required":false},"end_id":{"description":"End ID for the histogram","type":"int","required":false},"strip_non_ascii":{"description":"Strip non-ascii characters?","type":"boolean","required":false},"shared_salt":{"description":"Shared Salt to use when generating checksum","type":"string","required":false},"only_range_edges":{"description":"Should only range edges be returned","type":"boolean","required":false},"detailed_drilldown":{"description":"Do we want the checksum or object ids.","type":"boolean","required":false},"perform_text_conversion":{"description":"If text fields should be converted to latin1 in checksum calculation.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/sync\/data-histogram"}]}},"\/jetpack\/v4\/sync\/spawn-sync":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/sync\/spawn-sync"}]}},"\/jetpack\/v4\/sync\/locks":{"namespace":"jetpack\/v4","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/sync\/locks"}]}},"\/jetpack\/v4\/sync\/clear-queue":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/sync\/clear-queue"}]}},"\/jetpack\/v4\/jitm":{"namespace":"jetpack\/v4","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/jitm"}]}},"\/jetpack\/v4\/identity-crisis\/confirm-safe-mode":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/identity-crisis\/confirm-safe-mode"}]}},"\/jetpack\/v4\/identity-crisis\/migrate":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/identity-crisis\/migrate"}]}},"\/jetpack\/v4\/identity-crisis\/start-fresh":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"redirect_uri":{"description":"URI of the admin page where the user should be redirected after connection flow","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/identity-crisis\/start-fresh"}]}},"\/jetpack\/v4\/identity-crisis\/idc-url-validation":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/identity-crisis\/idc-url-validation"}]}},"\/jetpack\/v4\/identity-crisis\/url-secret":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/identity-crisis\/url-secret"}]}},"\/jetpack\/v4\/identity-crisis\/compare-url-secret":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"secret":{"description":"URL secret to compare to the ones stored in the database.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/identity-crisis\/compare-url-secret"}]}},"\/jetpack\/v4\/search\/plan":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/search\/plan"}]}},"\/jetpack\/v4\/search\/settings":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH","GET"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/search\/settings"}]}},"\/jetpack\/v4\/search\/stats":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/search\/stats"}]}},"\/jetpack\/v4\/search\/pricing":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/search\/pricing"}]}},"\/jetpack\/v4\/search\/plan\/activate":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/search\/plan\/activate"}]}},"\/jetpack\/v4\/search\/plan\/deactivate":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/search\/plan\/deactivate"}]}},"\/jetpack\/v4\/search":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/search"}]}},"\/jetpack\/v4\/search\/local-stats":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/search\/local-stats"}]}},"\/jetpack\/v4\/waf":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/waf"}]}},"\/jetpack\/v4\/waf\/update-rules":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/waf\/update-rules"}]}},"\/wpcom\/v2":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpcom\/v2","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2"}]}},"\/wpcom\/v2\/videopress\/meta":{"namespace":"wpcom\/v2","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The post id for the attachment.","type":"int","required":true},"title":{"description":"The title of the video.","type":"string","required":false},"description":{"description":"The description of the video.","type":"string","required":false},"caption":{"description":"The caption of the video.","type":"string","required":false},"rating":{"description":"The video content rating. One of G, PG-13 or R-17","type":"string","required":false},"display_embed":{"description":"Display the share menu in the player.","type":"boolean","required":false},"allow_download":{"description":"Display download option and allow viewers to download this video","type":"boolean","required":false},"privacy_setting":{"description":"How to determine if the video should be public or private","type":"int","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/videopress\/meta"}]}},"\/wpcom\/v2\/videopress\/(?P<video_guid>\\w+)\/poster":{"namespace":"wpcom\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"at_time":{"description":"The time in the video to use as the poster frame.","type":"int","required":false},"is_millisec":{"description":"Whether the time is in milliseconds or seconds.","type":"boolean","required":false},"poster_attachment_id":{"description":"The attachment id of the poster image.","type":"int","required":false}}}]},"\/wpcom\/v2\/videopress\/(?P<video_guid>\\w+)\/check-ownership\/(?P<post_id>\\d+)":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/wpcom\/v2\/videopress\/upload-jwt":{"namespace":"wpcom\/v2","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/videopress\/upload-jwt"}]}},"\/wpcom\/v2\/videopress\/playback-jwt\/(?P<video_guid>\\w+)":{"namespace":"wpcom\/v2","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/jetpack\/v4\/stats\/blog":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/stats\/blog"}]}},"\/jetpack\/v4\/stats-app":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"jetpack\/v4\/stats-app","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/stats-app"}]}},"\/jetpack\/v4\/stats-app\/sites\/248454572\/stats\/(?P<resource>[\\-\\w]+)\/(?P<resource_id>[\\d]+)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/248454572\/stats\/(?P<resource>[\\-\\w]+)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/248454572\/posts\/(?P<resource_id>[\\d]+)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/248454572\/posts\/(?P<resource_id>[\\d]+)\/likes":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/248454572\/stats":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/stats-app\/sites\/248454572\/stats"}]}},"\/jetpack\/v4\/stats-app\/sites\/248454572\/site-has-never-published-post":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/stats-app\/sites\/248454572\/site-has-never-published-post"}]}},"\/jetpack\/v4\/stats-app\/sites\/248454572\/posts":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/stats-app\/sites\/248454572\/posts"}]}},"\/jetpack\/v4\/stats-app\/sites\/248454572\/subscribers\/counts":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/stats-app\/sites\/248454572\/subscribers\/counts"}]}},"\/jetpack\/v4\/stats-app\/sites\/248454572\/jetpack-stats\/usage":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/stats-app\/sites\/248454572\/jetpack-stats\/usage"}]}},"\/jetpack\/v4\/stats-app\/sites\/248454572\/jetpack-stats\/user-feedback":{"namespace":"jetpack\/v4\/stats-app","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/stats-app\/sites\/248454572\/jetpack-stats\/user-feedback"}]}},"\/jetpack\/v4\/stats-app\/sites\/248454572\/wordads\/earnings":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/stats-app\/sites\/248454572\/wordads\/earnings"}]}},"\/jetpack\/v4\/stats-app\/sites\/248454572\/wordads\/stats":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/stats-app\/sites\/248454572\/wordads\/stats"}]}},"\/jetpack\/v4\/stats-app\/stats\/notices":{"namespace":"jetpack\/v4\/stats-app","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"type":"string","description":"ID of the notice","required":true},"status":{"type":"string","description":"Status of the notice","required":true},"postponed_for":{"type":"number","default":null,"description":"Postponed for (in seconds)","minimum":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/stats-app\/stats\/notices"}]}},"\/jetpack\/v4\/stats-app\/sites\/248454572\/jetpack-stats-dashboard\/notices":{"namespace":"jetpack\/v4\/stats-app","methods":["POST","PUT","PATCH","GET"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"type":"string","description":"ID of the notice","required":true},"status":{"type":"string","description":"Status of the notice","required":true},"postponed_for":{"type":"number","default":null,"description":"Postponed for (in seconds)","minimum":0,"required":false}}},{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/stats-app\/sites\/248454572\/jetpack-stats-dashboard\/notices"}]}},"\/jetpack\/v4\/stats-app\/sites\/248454572\/stats\/referrers\/spam\/new":{"namespace":"jetpack\/v4\/stats-app","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"domain":{"type":"string","description":"Domain of the referrer","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/stats-app\/sites\/248454572\/stats\/referrers\/spam\/new"}]}},"\/jetpack\/v4\/stats-app\/sites\/248454572\/stats\/referrers\/spam\/delete":{"namespace":"jetpack\/v4\/stats-app","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"domain":{"type":"string","description":"Domain of the referrer","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/stats-app\/sites\/248454572\/stats\/referrers\/spam\/delete"}]}},"\/jetpack\/v4\/stats-app\/sites\/248454572\/jetpack-stats-dashboard\/modules":{"namespace":"jetpack\/v4\/stats-app","methods":["POST","PUT","PATCH","GET"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/stats-app\/sites\/248454572\/jetpack-stats-dashboard\/modules"}]}},"\/jetpack\/v4\/stats-app\/sites\/248454572\/jetpack-stats-dashboard\/module-settings":{"namespace":"jetpack\/v4\/stats-app","methods":["POST","PUT","PATCH","GET"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/stats-app\/sites\/248454572\/jetpack-stats-dashboard\/module-settings"}]}},"\/jetpack\/v4\/stats-app\/sites\/248454572\/stats\/emails\/(?P<resource>[\\-\\w\\d]+)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/248454572\/stats\/opens\/emails\/(?P<post_id>[\\d]+)\/(?P<resource>[\\-\\w]+)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/248454572\/stats\/clicks\/emails\/(?P<post_id>[\\d]+)\/(?P<resource>[\\-\\w]+)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/248454572\/stats\/(?P<resource>[\\-\\w]+)\/emails\/(?P<post_id>[\\d]+)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/248454572\/stats\/utm\/(?P<utm_params>[_,\\-\\w]+)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/248454572\/stats\/devices\/(?P<device_property>[\\w]+)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/jetpack\/v4\/stats-app\/sites\/248454572\/commercial-classification":{"namespace":"jetpack\/v4\/stats-app","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/stats-app\/sites\/248454572\/commercial-classification"}]}},"\/jetpack\/v4\/stats-app\/sites\/248454572\/purchases":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/stats-app\/sites\/248454572\/purchases"}]}},"\/jetpack\/v4\/stats-app\/sites\/248454572\/stats\/location-views\/(?P<geo_mode>country|region|city)":{"namespace":"jetpack\/v4\/stats-app","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/bwz-upgrader\/v1":{"namespace":"bwz-upgrader\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"bwz-upgrader\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/bwz-upgrader\/v1"}]}},"\/bwz-upgrader\/v1\/config":{"namespace":"bwz-upgrader\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/bwz-upgrader\/v1\/config"}]}},"\/bwz-upgrader\/v1\/generate":{"namespace":"bwz-upgrader\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"prompt":{"type":"string","required":true},"content_type":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/bwz-upgrader\/v1\/generate"}]}},"\/duplicate-post\/v1":{"namespace":"duplicate-post\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"duplicate-post\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/duplicate-post\/v1"}]}},"\/duplicate-post\/v1\/original\/(?P<post_id>\\d+)":{"namespace":"duplicate-post\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"post_id":{"description":"The ID of the post to remove the original reference from.","type":"integer","required":true}}}]},"\/wpcom\/v2\/business-hours\/localized-week":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/business-hours\/localized-week"}]}},"\/wpcom\/v2\/admin-color":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/admin-color"}]}},"\/wpcom\/v2\/admin-menu":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/admin-menu"}]}},"\/wpcom\/v2\/jetpack-ai\/ai-assistant-feature":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/jetpack-ai\/ai-assistant-feature"}]}},"\/wpcom\/v2\/app-media":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"number":{"description":"Number of media items in the request","type":"number","default":20,"required":false},"page_handle":{"type":"number","default":1,"required":false},"after":{"description":"Timestamp since the media was uploaded","type":"number","default":0,"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/app-media"}]}},"\/wpcom\/v2\/editor-assets":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"exclude":{"description":"Comma-separated list of asset types to exclude from the response. Supported values: \"core\" (WordPress core assets), \"gutenberg\" (Gutenberg plugin assets), or plugin handle prefixes (e.g., \"contact-form-7\").","type":"string","default":"","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/editor-assets"}]}},"\/wpcom\/v2\/blog-stats":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"post_id":{"description":"Post ID to obtain stats for.","type":["string","integer"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/blog-stats"}]}},"\/wpcom\/v2\/email-preview":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"access":{"description":"Access level.","enum":["everybody","subscribers","paid_subscribers"],"default":"everybody","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/email-preview"}]}},"\/wpcom\/v2\/external-media\/list\/(?P<service>google_photos|openverse|pexels)":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"search":{"description":"Media collection search term.","type":"string","required":false},"number":{"description":"Number of media items in the request","type":"number","default":20,"required":false},"path":{"type":"string","required":false},"page_handle":{"type":"string","required":false},"session_id":{"description":"Session id of a service, currently only Google Photos Picker","type":"string","required":false}}}]},"\/wpcom\/v2\/external-media\/copy\/(?P<service>google_photos|openverse|pexels)":{"namespace":"wpcom\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"media":{"description":"Media data to copy.","items":{"type":"array","items":{"type":"object","required":true,"properties":{"caption":{"type":"string"},"guid":{"type":"object","properties":{"caption":{"type":"string"},"name":{"type":"string"},"title":{"type":"string"},"url":{"format":"uri","type":"string"}}},"title":{"type":"string"},"meta":{"type":"object","additionalProperties":false,"properties":{"vertical_id":{"type":"string","format":"text-field"},"pexels_object":{"type":"object"}}}}}},"type":"array","required":true},"post_id":{"description":"The post ID to attach the upload to.","type":"number","minimum":0,"required":false},"should_proxy":{"description":"Whether to proxy the media request.","type":"boolean","default":false,"required":false}}}]},"\/wpcom\/v2\/external-media\/connection\/(?P<service>google_photos)":{"namespace":"wpcom\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["DELETE"],"args":[]}]},"\/wpcom\/v2\/external-media\/connection\/(?P<service>google_photos)\/picker_status":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/wpcom\/v2\/external-media\/session\/(?P<service>google_photos)":{"namespace":"wpcom\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/wpcom\/v2\/external-media\/session\/(?P<service>google_photos)\/(?P<session_id>.*)":{"namespace":"wpcom\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["DELETE"],"args":[]}]},"\/wpcom\/v2\/external-media\/proxy\/(?P<service>google_photos)":{"namespace":"wpcom\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"url":{"type":"string","required":true}}}]},"\/wpcom\/v2\/following\/mine":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"ignore_user_blogs":{"type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/following\/mine"}]}},"\/wpcom\/v2\/following\/recommendations":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"number":{"type":"number","default":5,"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/following\/recommendations"}]}},"\/wpcom\/v2\/goodreads\/user-id":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Goodreads user ID","type":"integer","minimum":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/goodreads\/user-id"}]}},"\/wpcom\/v2\/checkGoogleDocVisibility":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/checkGoogleDocVisibility"}]}},"\/wpcom\/v2\/instagram-gallery\/connect-url":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/instagram-gallery\/connect-url"}]}},"\/wpcom\/v2\/instagram-gallery\/connections":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/instagram-gallery\/connections"}]}},"\/wpcom\/v2\/instagram-gallery\/gallery":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"access_token":{"description":"An Instagram Keyring access token.","type":"integer","minimum":1,"required":true},"count":{"description":"How many Instagram posts?","type":"integer","minimum":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/instagram-gallery\/gallery"}]}},"\/wpcom\/v2\/mailchimp":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/mailchimp"}]}},"\/wpcom\/v2\/mailchimp\/groups":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/mailchimp\/groups"}]}},"\/wpcom\/v2\/mailchimp\/settings":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/mailchimp\/settings"}]}},"\/wpcom\/v2\/newsletter-categories":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/newsletter-categories"}]}},"\/wpcom\/v2\/newsletter-categories\/count":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"term_ids":{"default":"","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/newsletter-categories\/count"}]}},"\/wpcom\/v2\/podcast-player":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The Podcast RSS feed URL.","type":"string","required":true},"guids":{"description":"A list of unique identifiers for fetching specific podcast episodes.","type":"array","required":true},"episode-options":{"description":"Whether we should return the episodes list for use in the selection UI","type":"boolean","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/podcast-player"}]}},"\/wpcom\/v2\/podcast-player\/track-quantity":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/podcast-player\/track-quantity"}]}},"\/wpcom\/v2\/profile":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/profile"}]}},"\/wpcom\/v2\/related-posts":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/related-posts"}]}},"\/wpcom\/v2\/related-posts\/enable":{"namespace":"wpcom\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/related-posts\/enable"}]}},"\/wpcom\/v2\/related-posts\/(?P<id>[\\d]+)":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false}}}]},"\/wpcom\/v2\/resolve-redirect\/?(?P<url>.+)?":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL to check for redirects.","type":"string","required":true}}}]},"\/wpcom\/v2\/search":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/search"}]}},"\/wpcom\/v2\/send-email-preview":{"namespace":"wpcom\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/send-email-preview"}]}},"\/wpcom\/v2\/template-loader\/(?P<template_type>\\w+)":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"template_type":{"description":"The type of the template.","type":"string","required":true}}}]},"\/wpcom\/v2\/post-types":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/post-types"}]}},"\/wpcom\/v2\/top-posts":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"period":{"description":"Timeframe for stats.","type":["string","integer"],"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/top-posts"}]}},"\/wpcom\/v2\/transients\/(?P<name>\\w{1,172})":{"namespace":"wpcom\/v2","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"name":{"description":"The name of the transient to delete.","type":"string","required":true}}}]},"\/wpcom\/v3":{"namespace":"wpcom\/v3","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpcom\/v3","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v3"}]}},"\/wpcom\/v3\/blogging-prompts":{"namespace":"wpcom\/v3","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"after":{"description":"Show prompts following a given date.","type":"string","required":false},"before":{"description":"Show prompts before a given date.","type":"string","required":false},"force_year":{"description":"Force the returned prompts to be for a specific year. Returns only one prompt for each day.","type":"integer","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v3\/blogging-prompts"}]}},"\/wpcom\/v3\/blogging-prompts\/(?P<id>[\\d]+)":{"namespace":"wpcom\/v3","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the prompt.","type":"integer","required":false}}}]},"\/wpcom\/v3\/jitm":{"namespace":"wpcom\/v3","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"message_path":{"type":"string","description":"The message path to fetch JITMs for","required":true},"query":{"type":"string","description":"Additional query parameters","required":false},"full_jp_logo_exists":{"type":"boolean","description":"Whether the full Jetpack logo exists","required":false}}},{"methods":["POST"],"args":{"id":{"type":"string","description":"The ID of the JITM to dismiss","required":true},"feature_class":{"type":"string","description":"The feature class of the JITM","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v3\/jitm"}]}},"\/wpcom\/v2\/gutenberg\/available-extensions":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/gutenberg\/available-extensions"}]}},"\/wpcom\/v2\/hello":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/hello"}]}},"\/wpcom\/v2\/publicize\/connection-test-results":{"namespace":"wpcom\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wpcom\/v2\/publicize\/connection-test-results"}]}},"\/wpcom\/v2\/service-api-keys\/(?P<service>[a-z\\-_]+)":{"namespace":"wpcom\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"service_api_key":{"type":"string","required":true}}},{"methods":["DELETE"],"args":[]}]},"\/yoast\/v1\/redirects":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"origin":{"type":"string","description":"The origin to redirect","required":true},"target":{"type":"string","description":"The redirect target","required":false},"type":{"type":"integer","description":"The redirect type","required":true},"ignore_warning":{"type":"boolean","description":"Whether to ignore warnings","default":false,"required":false},"format":{"description":"The format of the redirect to create.","type":"string","enum":["plain","regex"],"default":"plain","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/redirects"}]}},"\/yoast\/v1\/redirects\/delete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"origin":{"type":"string","description":"The origin to redirect","required":true},"target":{"type":"string","description":"The redirect target","required":false},"type":{"type":"string","description":"The redirect format","required":false},"ignore_warning":{"type":"boolean","description":"Whether to ignore warnings","default":false,"required":false},"format":{"description":"The format of the redirect to create.","type":"string","enum":["plain","regex"],"default":"plain","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/redirects\/delete"}]}},"\/yoast\/v1\/redirects\/list":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"format":{"description":"The format of the redirects to retrieve.","type":"string","enum":["plain","regex"],"default":"plain","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/redirects\/list"}]}},"\/yoast\/v1\/redirects\/update":{"namespace":"yoast\/v1","methods":["PUT"],"endpoints":[{"methods":["PUT"],"args":{"old_origin":{"type":"string","description":"The origin to redirect (old)","required":true},"old_target":{"type":"string","description":"The redirect target (old)","required":false},"old_type":{"type":"integer","description":"The redirect type (old)","required":true},"new_origin":{"type":"string","description":"The origin to redirect (new)","required":true},"new_target":{"type":"string","description":"The redirect target (new)","required":false},"new_type":{"type":"integer","description":"The redirect type (new)","required":true},"ignore_warning":{"type":"boolean","description":"Whether to ignore warnings","default":false,"required":false},"format":{"description":"The format of the redirects to retrieve.","type":"string","enum":["plain","regex"],"default":"plain","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/redirects\/update"}]}},"\/yoast\/v1\/redirects\/settings":{"namespace":"yoast\/v1","methods":["GET","PUT"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["PUT"],"args":{"disable_php_redirect":{"description":"Whether to disable PHP-based redirects and use .htaccess instead.","type":"string","enum":["on","off"],"required":true},"separate_file":{"description":"Whether to write redirects into a separate file instead of .htaccess.","type":"string","enum":["on","off"],"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/redirects\/settings"}]}},"\/yoast\/v1\/redirects\/undo-for-object":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"obj_id":{"type":"int","description":"The id of the post or term","required":true},"obj_type":{"type":"string","description":"The object type: post or term","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/yoast\/v1\/redirects\/undo-for-object"}]}},"\/jetpack-boost\/v1":{"namespace":"jetpack-boost\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"jetpack-boost\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack-boost\/v1"}]}},"\/jetpack-boost\/v1\/speed-scores":{"namespace":"jetpack-boost\/v1","methods":["POST","PUT","PATCH","POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack-boost\/v1\/speed-scores"}]}},"\/jetpack-boost\/v1\/speed-scores\/refresh":{"namespace":"jetpack-boost\/v1","methods":["POST","PUT","PATCH","POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack-boost\/v1\/speed-scores\/refresh"}]}},"\/jetpack-boost\/v1\/speed-scores-history":{"namespace":"jetpack-boost\/v1","methods":["POST","PUT","PATCH","POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"start":{"type":"number","required":true},"end":{"type":"number","required":true}}},{"methods":["POST","PUT","PATCH"],"args":{"start":{"type":"number","required":true},"end":{"type":"number","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack-boost\/v1\/speed-scores-history"}]}},"\/my-jetpack\/v1":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"my-jetpack\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1"}]}},"\/my-jetpack\/v1\/site\/products":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"products":{"description":"Comma-separated list of product slugs that should be retrieved.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/site\/products"}]}},"\/my-jetpack\/v1\/site\/products\/install":{"namespace":"my-jetpack\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"products":{"description":"Array of Product slugs","type":"array","items":{"enum":["anti-spam","backup","boost","crm","creator","extras","jetpack-ai","ai","scan","search","social","security","protect","videopress","stats","growth","complete","newsletter","site-accelerator","related-posts"],"type":"string"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/site\/products\/install"}]}},"\/my-jetpack\/v1\/site\/products\/activate":{"namespace":"my-jetpack\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"products":{"description":"Array of Product slugs","type":"array","items":{"enum":["anti-spam","backup","boost","crm","creator","extras","jetpack-ai","ai","scan","search","social","security","protect","videopress","stats","growth","complete","newsletter","site-accelerator","related-posts"],"type":"string"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/site\/products\/activate"}]}},"\/my-jetpack\/v1\/site\/products\/interstitials":{"namespace":"my-jetpack\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"products":{"description":"Key-value pairs of product slugs and their interstitial states.","type":"object","properties":{"anti-spam":{"type":"boolean"},"backup":{"type":"boolean"},"boost":{"type":"boolean"},"crm":{"type":"boolean"},"creator":{"type":"boolean"},"extras":{"type":"boolean"},"jetpack-ai":{"type":"boolean"},"ai":{"type":"boolean"},"scan":{"type":"boolean"},"search":{"type":"boolean"},"social":{"type":"boolean"},"security":{"type":"boolean"},"protect":{"type":"boolean"},"videopress":{"type":"boolean"},"stats":{"type":"boolean"},"growth":{"type":"boolean"},"complete":{"type":"boolean"},"newsletter":{"type":"boolean"},"site-accelerator":{"type":"boolean"},"related-posts":{"type":"boolean"}},"additionalProperties":false,"minProperties":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/site\/products\/interstitials"}]}},"\/my-jetpack\/v1\/site\/products\/deactivate":{"namespace":"my-jetpack\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"products":{"description":"Array of Product slugs","type":"array","items":{"enum":["anti-spam","backup","boost","crm","creator","extras","jetpack-ai","ai","scan","search","social","security","protect","videopress","stats","growth","complete","newsletter","site-accelerator","related-posts"],"type":"string"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/site\/products\/deactivate"}]}},"\/my-jetpack\/v1\/site\/products-ownership":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/site\/products-ownership"}]}},"\/my-jetpack\/v1\/site\/purchases":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/site\/purchases"}]}},"\/my-jetpack\/v1\/chat\/availability":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/chat\/availability"}]}},"\/my-jetpack\/v1\/chat\/authentication":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"type":"string","required":false},"test_mode":{"type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/chat\/authentication"}]}},"\/my-jetpack\/v1\/site\/recommendations\/evaluation":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/site\/recommendations\/evaluation"}]}},"\/my-jetpack\/v1\/site\/recommendations\/evaluation\/result":{"namespace":"my-jetpack\/v1","methods":["POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/site\/recommendations\/evaluation\/result"}]}},"\/my-jetpack\/v1\/site\/backup\/undo-event":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/site\/backup\/undo-event"}]}},"\/my-jetpack\/v1\/site\/protect\/data":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/site\/protect\/data"}]}},"\/my-jetpack\/v1\/site\/videopress\/data":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/site\/videopress\/data"}]}},"\/my-jetpack\/v1\/site\/update-historically-active-modules":{"namespace":"my-jetpack\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/site\/update-historically-active-modules"}]}},"\/my-jetpack\/v1\/jetpack-manage\/data":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/jetpack-manage\/data"}]}},"\/my-jetpack\/v1\/red-bubble-notifications":{"namespace":"my-jetpack\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"dismissal_cookies":{"type":"array","description":"Array of dismissal cookies to set for the red bubble notifications.","items":{"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/red-bubble-notifications"}]}},"\/my-jetpack\/v1\/site":{"namespace":"my-jetpack\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/site"}]}},"\/my-jetpack\/v1\/site\/dismiss-welcome-banner":{"namespace":"my-jetpack\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/my-jetpack\/v1\/site\/dismiss-welcome-banner"}]}},"\/jetpack\/v4\/explat":{"namespace":"jetpack\/v4\/explat","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"jetpack\/v4\/explat","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/explat"}]}},"\/jetpack\/v4\/explat\/assignments":{"namespace":"jetpack\/v4\/explat","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"experiment_name":{"type":"string","required":false},"anon_id":{"type":"string","required":false},"as_connected_user":{"type":"boolean","required":false},"platform":{"type":"string","enum":["jetpack","calypso","wpcom"],"default":"jetpack","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/explat\/assignments"}]}},"\/gf\/v2":{"namespace":"gf\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"gf\/v2","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/gf\/v2"}]}},"\/gf\/v2\/entries":{"namespace":"gf\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"sorting":{"description":"The sorting criteria.","required":false},"paging":{"description":"The paging criteria.","required":false},"search":{"description":"The search criteria.","type":"string","required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"_field_ids":{"description":"Comma separated list of fields to include in the response.","type":"string","required":false},"_labels":{"description":"Whether to include the labels in the response.","type":"integer","required":false}}},{"methods":["POST"],"args":{"form_id":{"description":"The Form ID for the entry.","type":"integer","required":true},"date_created":{"description":"The date the entry was created, in UTC.","type":"string","required":false},"date_updated":{"description":"The date the entry was updated, in UTC.","type":"string","required":false},"is_starred":{"description":"Whether the entry is starred.","type":"integer","required":false},"is_read":{"description":"Whether the entry has been read.","type":"integer","required":false},"ip":{"description":"The IP address of the entry creator.","type":"string","required":false},"source_url":{"description":"The URL where the form was embedded.","type":"string","required":false},"user_agent":{"description":"The user agent string for the browser used to submit the entry.","type":"string","required":false},"payment_status":{"description":"The status of the payment, if applicable.","type":"string","required":false},"payment_date":{"description":"The date of the payment, if applicable.","type":"string","required":false},"payment_amount":{"description":"The amount of the payment, if applicable.","type":"string","required":false},"payment_method":{"description":"The payment method for the payment, if applicable.","type":"string","required":false},"transaction_id":{"description":"The transaction ID for the payment, if applicable.","type":"string","required":false},"is_fulfilled":{"description":"Whether the transaction has been fulfilled, if applicable.","type":"string","required":false},"created_by":{"description":"The user ID of the entry submitter.","type":"integer","required":false},"transaction_type":{"description":"The type of the transaction, if applicable.","type":"string","required":false},"status":{"description":"The status of the entry.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/gf\/v2\/entries"}]}},"\/gf\/v2\/entries\/(?P<entry_id>[\\d]+)":{"namespace":"gf\/v2","methods":["GET","PUT","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["PUT"],"args":{"form_id":{"description":"The Form ID for the entry.","type":"integer","required":false},"date_created":{"description":"The date the entry was created, in UTC.","type":"string","required":false},"date_updated":{"description":"The date the entry was updated, in UTC.","type":"string","required":false},"is_starred":{"description":"Whether the entry is starred.","type":"integer","required":false},"is_read":{"description":"Whether the entry has been read.","type":"integer","required":false},"ip":{"description":"The IP address of the entry creator.","type":"string","required":false},"source_url":{"description":"The URL where the form was embedded.","type":"string","required":false},"user_agent":{"description":"The user agent string for the browser used to submit the entry.","type":"string","required":false},"payment_status":{"description":"The status of the payment, if applicable.","type":"string","required":false},"payment_date":{"description":"The date of the payment, if applicable.","type":"string","required":false},"payment_amount":{"description":"The amount of the payment, if applicable.","type":"string","required":false},"payment_method":{"description":"The payment method for the payment, if applicable.","type":"string","required":false},"transaction_id":{"description":"The transaction ID for the payment, if applicable.","type":"string","required":false},"is_fulfilled":{"description":"Whether the transaction has been fulfilled, if applicable.","type":"string","required":false},"created_by":{"description":"The user ID of the entry submitter.","type":"integer","required":false},"transaction_type":{"description":"The type of the transaction, if applicable.","type":"string","required":false},"status":{"description":"The status of the entry.","type":"string","required":false}}},{"methods":["DELETE"],"args":[]}]},"\/gf\/v2\/entries\/(?P<entry_id>[\\d]+)\/properties":{"namespace":"gf\/v2","methods":["PUT"],"endpoints":[{"methods":["PUT"],"args":[]}]},"\/gf\/v2\/entries\/(?P<entry_id>[\\d]+)\/notifications":{"namespace":"gf\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"include":{"description":"Limit the notifications to specific IDs.","required":false},"event":{"description":"The event to trigger. Default: form_submission.","required":false}}}]},"\/gf\/v2\/notes":{"namespace":"gf\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/gf\/v2\/notes"}]}},"\/gf\/v2\/notes\/(?P<note_id>[\\d]+)":{"namespace":"gf\/v2","methods":["GET","PUT","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}},{"methods":["PUT"],"args":[]},{"methods":["DELETE"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}]},"\/gf\/v2\/entries\/(?P<entry_id>[\\d]+)\/notes":{"namespace":"gf\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}},{"methods":["POST"],"args":[]}]},"\/gf\/v2\/forms\/(?P<form_id>[\\d]+)\/entries":{"namespace":"gf\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"sorting":{"description":"The sorting criteria.","required":false},"paging":{"description":"The paging criteria.","required":false},"search":{"description":"The search criteria.","type":"string","required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"_field_ids":{"description":"Comma separated list of fields to include in the response.","type":"string","required":false},"_labels":{"description":"Whether to include the labels in the response.","type":"integer","required":false}}},{"methods":["POST"],"args":{"form_id":{"description":"The Form ID for the entry.","type":"integer","required":true},"date_created":{"description":"The date the entry was created, in UTC.","type":"string","required":false},"date_updated":{"description":"The date the entry was updated, in UTC.","type":"string","required":false},"is_starred":{"description":"Whether the entry is starred.","type":"integer","required":false},"is_read":{"description":"Whether the entry has been read.","type":"integer","required":false},"ip":{"description":"The IP address of the entry creator.","type":"string","required":false},"source_url":{"description":"The URL where the form was embedded.","type":"string","required":false},"user_agent":{"description":"The user agent string for the browser used to submit the entry.","type":"string","required":false},"payment_status":{"description":"The status of the payment, if applicable.","type":"string","required":false},"payment_date":{"description":"The date of the payment, if applicable.","type":"string","required":false},"payment_amount":{"description":"The amount of the payment, if applicable.","type":"string","required":false},"payment_method":{"description":"The payment method for the payment, if applicable.","type":"string","required":false},"transaction_id":{"description":"The transaction ID for the payment, if applicable.","type":"string","required":false},"is_fulfilled":{"description":"Whether the transaction has been fulfilled, if applicable.","type":"string","required":false},"created_by":{"description":"The user ID of the entry submitter.","type":"integer","required":false},"transaction_type":{"description":"The type of the transaction, if applicable.","type":"string","required":false},"status":{"description":"The status of the entry.","type":"string","required":false}}}]},"\/gf\/v2\/forms\/(?P<form_id>[\\d]+)\/results":{"namespace":"gf\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"search":{"description":"The search criteria.","type":"string","required":false}}}]},"\/gf\/v2\/forms\/(?P<form_id>[\\d]+)\/results\/schema":{"namespace":"gf\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/gf\/v2\/forms\/(?P<form_id>[\\d]+)\/submissions":{"namespace":"gf\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"input_[Field ID]":{"description":"The input values.","type":"string","required":false},"field_values":{"description":"The field values.","type":["string","array"],"required":false},"target_page":{"description":"The target page number.","type":"integer","required":false},"source_page":{"description":"The source page number.","type":"integer","required":false}}}]},"\/gf\/v2\/forms\/(?P<form_id>[\\d]+)\/submissions\/validation":{"namespace":"gf\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/gf\/v2\/forms":{"namespace":"gf\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/gf\/v2\/forms"}]}},"\/gf\/v2\/forms\/(?P<id>[\\d]+)":{"namespace":"gf\/v2","methods":["GET","PUT","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}},{"methods":["PUT"],"args":[]},{"methods":["DELETE"],"args":{"force":{"default":false,"required":false}}}]},"\/gf\/v2\/forms\/schema":{"namespace":"gf\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/gf\/v2\/forms\/schema"}]}},"\/gf\/v2\/feeds":{"namespace":"gf\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false}}},{"methods":["POST"],"args":{"meta":{"description":"The JSON string containing the feed meta.","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/gf\/v2\/feeds"}]}},"\/gf\/v2\/feeds\/(?P<feed_id>[\\d]+)":{"namespace":"gf\/v2","methods":["GET","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["PUT","PATCH"],"args":{"meta":{"description":"The JSON string containing the feed meta.","type":"object","required":false}}},{"methods":["DELETE"],"args":[]}]},"\/gf\/v2\/forms\/(?P<form_id>[\\d]+)\/feeds":{"namespace":"gf\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false}}},{"methods":["POST"],"args":{"meta":{"description":"The JSON string containing the feed meta.","type":"object","required":false}}}]},"\/gf\/v2\/forms\/(?P<form_id>[\\d]+)\/field-filters":{"namespace":"gf\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"_admin_labels":{"description":"Whether to include the field admin labels in the response, if configured.","type":"integer","required":false}}}]},"\/gf\/v2\/feeds\/(?P<feed_id>[\\d]+)\/properties":{"namespace":"gf\/v2","methods":["PUT"],"endpoints":[{"methods":["PUT"],"args":{"form_id":{"description":"The Form ID for the feed.","type":"integer","required":false},"is_active":{"description":"Indicates if the feed is active or inactive.","type":"boolean","required":false},"feed_order":{"description":"The position of the feed on the feeds list page and when processed; for add-ons which support feed ordering.","type":"integer","required":false},"meta":{"description":"The JSON string containing the feed meta.","type":"object","required":false},"addon_slug":{"description":"The add-on the feed belongs to.","type":"string","required":false}}}]},"\/omapp\/v1":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"omapp\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1"}]}},"\/omapp\/v1\/info":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1\/info"}]}},"\/omapp\/v1\/support":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1\/support"}]}},"\/omapp\/v1\/support\/debug\/enable":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1\/support\/debug\/enable"}]}},"\/omapp\/v1\/support\/debug\/disable":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1\/support\/debug\/disable"}]}},"\/omapp\/v1\/me":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1\/me"}]}},"\/omapp\/v1\/campaigns\/refresh":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1\/campaigns\/refresh"}]}},"\/omapp\/v1\/campaigns\/(?P<id>\\w+)":{"namespace":"omapp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}]},"\/omapp\/v1\/campaigns\/(?P<id>[\\w-]+)\/sync":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/omapp\/v1\/resources":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1\/resources"}]}},"\/omapp\/v1\/notifications":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1\/notifications"}]}},"\/omapp\/v1\/notifications\/dismiss":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1\/notifications\/dismiss"}]}},"\/omapp\/v1\/notifications\/create":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1\/notifications\/create"}]}},"\/omapp\/v1\/plugins":{"namespace":"omapp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1\/plugins"}]}},"\/omapp\/v1\/api":{"namespace":"omapp\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":[]},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1\/api"}]}},"\/omapp\/v1\/settings":{"namespace":"omapp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1\/settings"}]}},"\/omapp\/v1\/review\/dismiss":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1\/review\/dismiss"}]}},"\/omapp\/v1\/omu\/courses":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1\/omu\/courses"}]}},"\/omapp\/v1\/omu\/guides":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1\/omu\/guides"}]}},"\/omapp\/v1\/account\/sync":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1\/account\/sync"}]}},"\/omapp\/v1\/account\/connect":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/omapp\/v1\/account\/connect"}]}},"\/gwiz\/v1":{"namespace":"gwiz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"gwiz\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/gwiz\/v1"}]}},"\/gwiz\/v1\/products":{"namespace":"gwiz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/gwiz\/v1\/products"}]}},"\/gwiz\/v1\/products\/(?P<id>[\\w-]+)":{"namespace":"gwiz\/v1","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["DELETE"],"args":{"id":{"type":"string","required":true}}}]},"\/gwiz\/v1\/products\/(?P<id>[\\d]+)\/details":{"namespace":"gwiz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"integer","minimum":1,"required":true}}}]},"\/gwiz\/v1\/products\/(?P<id>[\\w-]+)\/activate":{"namespace":"gwiz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"string","required":true}}}]},"\/gwiz\/v1\/products\/(?P<id>[\\w-]+)\/deactivate":{"namespace":"gwiz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"string","required":true}}}]},"\/gwiz\/v1\/products\/(?P<id>[\\w-]+)\/install":{"namespace":"gwiz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"string","required":true}}}]},"\/gwiz\/v1\/products\/(?P<id>[\\w-]+)\/uninstall":{"namespace":"gwiz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"string","required":true}}}]},"\/gwiz\/v1\/products\/(?P<id>[\\w-]+)\/update":{"namespace":"gwiz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"string","required":true}}}]},"\/gwiz\/v1\/license":{"namespace":"gwiz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/gwiz\/v1\/license"}]}},"\/gwiz\/v1\/license\/(?P<product_type>[\\w-]+)":{"namespace":"gwiz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"product_type":{"type":"string","enum":["perk","connect","shop","free","wiz-bundle"],"required":true}}}]},"\/gwiz\/v1\/license\/(?P<product_type>[\\w-]+)\/validate":{"namespace":"gwiz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"product_type":{"type":"string","enum":["perk","connect","shop","free","wiz-bundle"],"required":true},"license_key":{"type":"string","required":true}}}]},"\/gwiz\/v1\/license\/(?P<product_type>[\\w-]+)\/deactivate":{"namespace":"gwiz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"product_type":{"type":"string","enum":["perk","connect","shop","free","wiz-bundle"],"required":true}}}]},"\/gwiz\/v1\/license\/(?P<product_type>[\\w-]+)\/products\/(?P<id>[\\w-]+)\/register":{"namespace":"gwiz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"product_type":{"type":"string","enum":["perk","connect","shop","free","wiz-bundle"],"required":true},"id":{"type":"string","required":true}}}]},"\/gwiz\/v1\/license\/(?P<product_type>[\\w-]+)\/products\/(?P<id>[\\w-]+)\/deregister":{"namespace":"gwiz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"product_type":{"type":"string","enum":["perk","connect","shop","free","wiz-bundle"],"required":true},"id":{"type":"string","required":true}}}]},"\/gwiz\/v1\/spellbook\/register":{"namespace":"gwiz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"email":{"type":"string","format":"email","required":true},"name":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/gwiz\/v1\/spellbook\/register"}]}},"\/gwiz\/v1\/spellbook\/registration-status":{"namespace":"gwiz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/gwiz\/v1\/spellbook\/registration-status"}]}},"\/gwiz\/v1\/announcements":{"namespace":"gwiz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"force":{"type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/gwiz\/v1\/announcements"}]}},"\/gwiz\/v1\/announcements\/(?P<id>[\\w-]+)\/dismiss":{"namespace":"gwiz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"string","required":true}}}]},"\/jetpack\/v4\/verify_registration":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/verify_registration"}]}},"\/jetpack\/v4\/remote_authorize":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/remote_authorize"}]}},"\/jetpack\/v4\/remote_provision":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/remote_provision"}]}},"\/jetpack\/v4\/remote_register":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/remote_register"}]}},"\/jetpack\/v4\/remote_connect":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/remote_connect"}]}},"\/jetpack\/v4\/connection\/check":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/connection\/check"}]}},"\/jetpack\/v4\/connection":{"namespace":"jetpack\/v4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"isActive":{"description":"Set to false will trigger the site to disconnect.","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/connection"}]}},"\/jetpack\/v4\/connection\/user":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/connection\/user"}]}},"\/jetpack\/v4\/connection\/data":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/connection\/data"}]}},"\/jetpack\/v4\/connection\/plugins":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/connection\/plugins"}]}},"\/jetpack\/v4\/connection\/reconnect":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/connection\/reconnect"}]}},"\/jetpack\/v4\/connection\/register":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"from":{"description":"Indicates where the registration action was triggered for tracking\/segmentation purposes","type":"string","required":false},"redirect_uri":{"description":"URI of the admin page where the user should be redirected after connection flow","type":"string","required":false},"plugin_slug":{"description":"Indicates from what plugin the request is coming from","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/connection\/register"}]}},"\/jetpack\/v4\/connection\/authorize_url":{"namespace":"jetpack\/v4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"redirect_uri":{"description":"URI of the admin page where the user should be redirected after connection flow","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/connection\/authorize_url"}]}},"\/jetpack\/v4\/user-token":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"user_token":{"description":"New user token","type":"string","required":true},"is_connection_owner":{"description":"Is connection owner","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/user-token"}]}},"\/jetpack\/v4\/connection\/owner":{"namespace":"jetpack\/v4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"owner":{"description":"New owner","type":"integer","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/jetpack\/v4\/connection\/owner"}]}},"\/gf\/v2\/zapier-requirements":{"namespace":"gf\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/gf\/v2\/zapier-requirements"}]}},"\/gf\/v2\/forms\/(?P<form_id>[\\d]+)\/sample-entry":{"namespace":"gf\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/gf\/v2\/forms\/(?P<form_id>[\\d]+)\/zapier-sample-entries":{"namespace":"gf\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"_admin_labels":{"description":"Indicates if admin labels should be used instead of frontend labels.","type":"boolean","required":false}}}]},"\/gf\/v2\/forms\/(?P<form_id>[\\d]+)\/zapier-transfer-entries":{"namespace":"gf\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/gf\/v2\/forms\/(?P<form_id>[\\d]+)\/zapier-feeds\/(?P<zap_id>[\\d]+)":{"namespace":"gf\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/wp\/v2":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp\/v2","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2"}]}},"\/wp\/v2\/posts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"tribe_format":{"description":"Limit result set to items with specific terms assigned in the tribe_format taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tribe_format_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tribe_format taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"product_funnel":{"description":"Limit result set to items with specific terms assigned in the product_funnel taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"product_funnel_exclude":{"description":"Limit result set to items except those with specific terms assigned in the product_funnel taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"project":{"description":"Limit result set to items with specific terms assigned in the project taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"project_exclude":{"description":"Limit result set to items except those with specific terms assigned in the project taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"industry":{"description":"Limit result set to items with specific terms assigned in the industry taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"industry_exclude":{"description":"Limit result set to items except those with specific terms assigned in the industry taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"business_size":{"description":"Limit result set to items with specific terms assigned in the business_size taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"business_size_exclude":{"description":"Limit result set to items except those with specific terms assigned in the business_size taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"sticky":{"description":"Limit result set to items that are sticky.","type":"boolean","required":false},"ignore_sticky":{"description":"Whether to ignore sticky posts or not.","type":"boolean","default":true,"required":false},"format":{"description":"Limit result set to items assigned one or more given formats.","type":"array","uniqueItems":true,"items":{"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"type":"string"},"required":false},"lang":{"description":"Limit results to a specific language. By default, results are not filtered by language.","type":"string","enum":["","en","es","de","fr"],"default":"","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tribe_format":{"description":"The terms assigned to the post in the tribe_format taxonomy.","type":"array","items":{"type":"integer"},"required":false},"product_funnel":{"description":"The terms assigned to the post in the product_funnel taxonomy.","type":"array","items":{"type":"integer"},"required":false},"project":{"description":"The terms assigned to the post in the project taxonomy.","type":"array","items":{"type":"integer"},"required":false},"industry":{"description":"The terms assigned to the post in the industry taxonomy.","type":"array","items":{"type":"integer"},"required":false},"business_size":{"description":"The terms assigned to the post in the business_size taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/posts"}]}},"\/wp\/v2\/posts\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tribe_format":{"description":"The terms assigned to the post in the tribe_format taxonomy.","type":"array","items":{"type":"integer"},"required":false},"product_funnel":{"description":"The terms assigned to the post in the product_funnel taxonomy.","type":"array","items":{"type":"integer"},"required":false},"project":{"description":"The terms assigned to the post in the project taxonomy.","type":"array","items":{"type":"integer"},"required":false},"industry":{"description":"The terms assigned to the post in the industry taxonomy.","type":"array","items":{"type":"integer"},"required":false},"business_size":{"description":"The terms assigned to the post in the business_size taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/posts\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tribe_format":{"description":"The terms assigned to the post in the tribe_format taxonomy.","type":"array","items":{"type":"integer"},"required":false},"product_funnel":{"description":"The terms assigned to the post in the product_funnel taxonomy.","type":"array","items":{"type":"integer"},"required":false},"project":{"description":"The terms assigned to the post in the project taxonomy.","type":"array","items":{"type":"integer"},"required":false},"industry":{"description":"The terms assigned to the post in the industry taxonomy.","type":"array","items":{"type":"integer"},"required":false},"business_size":{"description":"The terms assigned to the post in the business_size taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/pages":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","completed","any"],"type":"string"},"required":false},"lang":{"description":"Limit results to a specific language. By default, results are not filtered by language.","type":"string","enum":["","en","es","de","fr"],"default":"","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/pages"}]}},"\/wp\/v2\/pages\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/pages\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/media":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"inherit","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["inherit","private","trash"],"type":"string"},"required":false},"lang":{"description":"Limit results to a specific language. By default, results are not filtered by language.","type":"string","enum":["","en","es","de","fr"],"default":"","required":false},"media_type":{"default":null,"description":"Limit result set to attachments of a particular media type or media types.","type":"array","items":{"type":"string","enum":["image","video","audio","application","text"]},"required":false},"mime_type":{"default":null,"description":"Limit result set to attachments of a particular MIME type or MIME types.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/media"}]}},"\/wp\/v2\/media\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/post-process":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"action":{"type":"string","enum":["create-image-subsizes"],"required":true}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/edit":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"src":{"description":"URL to the edited image file.","type":"string","format":"uri","required":true},"modifiers":{"description":"Array of image edits.","type":"array","minItems":1,"items":{"description":"Image edit.","type":"object","required":["type","args"],"oneOf":[{"title":"Flip","properties":{"type":{"description":"Flip type.","type":"string","enum":["flip"]},"args":{"description":"Flip arguments.","type":"object","required":["flip"],"properties":{"flip":{"description":"Flip direction.","type":"object","required":["horizontal","vertical"],"properties":{"horizontal":{"description":"Whether to flip in the horizontal direction.","type":"boolean"},"vertical":{"description":"Whether to flip in the vertical direction.","type":"boolean"}}}}}}},{"title":"Rotation","properties":{"type":{"description":"Rotation type.","type":"string","enum":["rotate"]},"args":{"description":"Rotation arguments.","type":"object","required":["angle"],"properties":{"angle":{"description":"Angle to rotate clockwise in degrees.","type":"number"}}}}},{"title":"Crop","properties":{"type":{"description":"Crop type.","type":"string","enum":["crop"]},"args":{"description":"Crop arguments.","type":"object","required":["left","top","width","height"],"properties":{"left":{"description":"Horizontal position from the left to begin the crop as a percentage of the image width.","type":"number"},"top":{"description":"Vertical position from the top to begin the crop as a percentage of the image height.","type":"number"},"width":{"description":"Width of the crop as a percentage of the image width.","type":"number"},"height":{"description":"Height of the crop as a percentage of the image height.","type":"number"}}}}}]},"required":false},"rotation":{"description":"The amount to rotate the image clockwise in degrees. DEPRECATED: Use `modifiers` instead.","type":"integer","minimum":0,"exclusiveMinimum":true,"maximum":360,"exclusiveMaximum":true,"required":false},"x":{"description":"As a percentage of the image, the x position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"y":{"description":"As a percentage of the image, the y position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"width":{"description":"As a percentage of the image, the width to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"height":{"description":"As a percentage of the image, the height to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false}}}]},"\/wp\/v2\/menu-items":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"menu_order","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"menus":{"description":"Limit result set to items with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"menus_exclude":{"description":"Limit result set to items except those with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"default":"custom","description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"default":"publish","description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"parent":{"default":0,"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"default":1,"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"default":0,"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_pll_menu_item":{"type":"object","title":"","description":"Language switcher settings","default":[],"additionalProperties":{"type":"boolean"}}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/menu-items"}]}},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_pll_menu_item":{"type":"object","title":"","description":"Language switcher settings","default":[],"additionalProperties":{"type":"boolean"}}},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_pll_menu_item":{"type":"object","title":"","description":"Language switcher settings","default":[],"additionalProperties":{"type":"boolean"}}},"required":false}}}]},"\/wp\/v2\/menu-items\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/blocks":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"wp_pattern_category":{"description":"Limit result set to items with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"wp_pattern_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"lang":{"description":"Limit results to a specific language. By default, results are not filtered by language.","type":"string","enum":["","en","es","de","fr"],"default":"","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/blocks"}]}},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/templates":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/templates"}]}},"\/wp\/v2\/templates\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/templates\/lookup"}]}},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/template-parts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/template-parts"}]}},"\/wp\/v2\/template-parts\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/template-parts\/lookup"}]}},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the global styles revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the global styles revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[\\\/\\s%\\w\\.\\(\\)\\[\\]\\@_\\-]+)\/variations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<id>[\\\/\\d+]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"id":{"description":"ID of global styles config.","type":"integer","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":false},"args":{"styles":{"description":"Global styles.","type":["object"],"required":false},"settings":{"description":"Global settings.","type":["object"],"required":false},"title":{"description":"Title of the global styles variation.","type":["object","string"],"properties":{"raw":{"description":"Title for the global styles variation, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false}}}]},"\/wp\/v2\/navigation":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","completed","any"],"type":"string"},"required":false},"lang":{"description":"Limit results to a specific language. By default, results are not filtered by language.","type":"string","enum":["","en","es","de","fr"],"default":"","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/navigation"}]}},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/font-families":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"args":{"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/font-families"}]}},"\/wp\/v2\/font-families\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false}}},{"methods":["POST"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_face_settings":{"description":"font-face declaration in theme.json format, encoded as a string.","type":"string","required":true}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/ads":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"ad-group":{"description":"Limit result set to items with specific terms assigned in the ad-group taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ad-group_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ad-group taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ad-group":{"description":"The terms assigned to the post in the ad-group taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/ads"}]}},"\/wp\/v2\/ads\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ad-group":{"description":"The terms assigned to the post in the ad-group taxonomy.","type":"array","items":{"type":"integer"},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/tribe_download":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"tribe_download_type":{"description":"Limit result set to items with specific terms assigned in the tribe_download_type taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tribe_download_type_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tribe_download_type taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"product_funnel":{"description":"Limit result set to items with specific terms assigned in the product_funnel taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"product_funnel_exclude":{"description":"Limit result set to items except those with specific terms assigned in the product_funnel taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"project":{"description":"Limit result set to items with specific terms assigned in the project taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"project_exclude":{"description":"Limit result set to items except those with specific terms assigned in the project taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"industry":{"description":"Limit result set to items with specific terms assigned in the industry taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"industry_exclude":{"description":"Limit result set to items except those with specific terms assigned in the industry taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"business_size":{"description":"Limit result set to items with specific terms assigned in the business_size taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"business_size_exclude":{"description":"Limit result set to items except those with specific terms assigned in the business_size taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"lang":{"description":"Limit results to a specific language. By default, results are not filtered by language.","type":"string","enum":["","en","es","de","fr"],"default":"","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tribe_download_type":{"description":"The terms assigned to the post in the tribe_download_type taxonomy.","type":"array","items":{"type":"integer"},"required":false},"product_funnel":{"description":"The terms assigned to the post in the product_funnel taxonomy.","type":"array","items":{"type":"integer"},"required":false},"project":{"description":"The terms assigned to the post in the project taxonomy.","type":"array","items":{"type":"integer"},"required":false},"industry":{"description":"The terms assigned to the post in the industry taxonomy.","type":"array","items":{"type":"integer"},"required":false},"business_size":{"description":"The terms assigned to the post in the business_size taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/tribe_download"}]}},"\/wp\/v2\/tribe_download\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tribe_download_type":{"description":"The terms assigned to the post in the tribe_download_type taxonomy.","type":"array","items":{"type":"integer"},"required":false},"product_funnel":{"description":"The terms assigned to the post in the product_funnel taxonomy.","type":"array","items":{"type":"integer"},"required":false},"project":{"description":"The terms assigned to the post in the project taxonomy.","type":"array","items":{"type":"integer"},"required":false},"industry":{"description":"The terms assigned to the post in the industry taxonomy.","type":"array","items":{"type":"integer"},"required":false},"business_size":{"description":"The terms assigned to the post in the business_size taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/tribe_download\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/tribe_download\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/tribe_download\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tribe_download_type":{"description":"The terms assigned to the post in the tribe_download_type taxonomy.","type":"array","items":{"type":"integer"},"required":false},"product_funnel":{"description":"The terms assigned to the post in the product_funnel taxonomy.","type":"array","items":{"type":"integer"},"required":false},"project":{"description":"The terms assigned to the post in the project taxonomy.","type":"array","items":{"type":"integer"},"required":false},"industry":{"description":"The terms assigned to the post in the industry taxonomy.","type":"array","items":{"type":"integer"},"required":false},"business_size":{"description":"The terms assigned to the post in the business_size taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}]},"\/wp\/v2\/tribe_download\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/tribe_media":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"tribe_format":{"description":"Limit result set to items with specific terms assigned in the tribe_format taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tribe_format_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tribe_format taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tribe_media_type":{"description":"Limit result set to items with specific terms assigned in the tribe_media_type taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tribe_media_type_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tribe_media_type taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"product_funnel":{"description":"Limit result set to items with specific terms assigned in the product_funnel taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"product_funnel_exclude":{"description":"Limit result set to items except those with specific terms assigned in the product_funnel taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"project":{"description":"Limit result set to items with specific terms assigned in the project taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"project_exclude":{"description":"Limit result set to items except those with specific terms assigned in the project taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"industry":{"description":"Limit result set to items with specific terms assigned in the industry taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"industry_exclude":{"description":"Limit result set to items except those with specific terms assigned in the industry taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"business_size":{"description":"Limit result set to items with specific terms assigned in the business_size taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"business_size_exclude":{"description":"Limit result set to items except those with specific terms assigned in the business_size taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"lang":{"description":"Limit results to a specific language. By default, results are not filtered by language.","type":"string","enum":["","en","es","de","fr"],"default":"","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tribe_format":{"description":"The terms assigned to the post in the tribe_format taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tribe_media_type":{"description":"The terms assigned to the post in the tribe_media_type taxonomy.","type":"array","items":{"type":"integer"},"required":false},"product_funnel":{"description":"The terms assigned to the post in the product_funnel taxonomy.","type":"array","items":{"type":"integer"},"required":false},"project":{"description":"The terms assigned to the post in the project taxonomy.","type":"array","items":{"type":"integer"},"required":false},"industry":{"description":"The terms assigned to the post in the industry taxonomy.","type":"array","items":{"type":"integer"},"required":false},"business_size":{"description":"The terms assigned to the post in the business_size taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/tribe_media"}]}},"\/wp\/v2\/tribe_media\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tribe_format":{"description":"The terms assigned to the post in the tribe_format taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tribe_media_type":{"description":"The terms assigned to the post in the tribe_media_type taxonomy.","type":"array","items":{"type":"integer"},"required":false},"product_funnel":{"description":"The terms assigned to the post in the product_funnel taxonomy.","type":"array","items":{"type":"integer"},"required":false},"project":{"description":"The terms assigned to the post in the project taxonomy.","type":"array","items":{"type":"integer"},"required":false},"industry":{"description":"The terms assigned to the post in the industry taxonomy.","type":"array","items":{"type":"integer"},"required":false},"business_size":{"description":"The terms assigned to the post in the business_size taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/tribe_media\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/tribe_media\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/tribe_media\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tribe_format":{"description":"The terms assigned to the post in the tribe_format taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tribe_media_type":{"description":"The terms assigned to the post in the tribe_media_type taxonomy.","type":"array","items":{"type":"integer"},"required":false},"product_funnel":{"description":"The terms assigned to the post in the product_funnel taxonomy.","type":"array","items":{"type":"integer"},"required":false},"project":{"description":"The terms assigned to the post in the project taxonomy.","type":"array","items":{"type":"integer"},"required":false},"industry":{"description":"The terms assigned to the post in the industry taxonomy.","type":"array","items":{"type":"integer"},"required":false},"business_size":{"description":"The terms assigned to the post in the business_size taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}]},"\/wp\/v2\/tribe_media\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/modal":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","completed","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/modal"}]}},"\/wp\/v2\/modal\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/modal\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/modal\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/modal\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/modal\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/tribe_stream":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"tribe_event_type":{"description":"Limit result set to items with specific terms assigned in the tribe_event_type taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tribe_event_type_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tribe_event_type taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tribe_post_state":{"description":"Limit result set to items with specific terms assigned in the tribe_post_state taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tribe_post_state_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tribe_post_state taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"product_funnel":{"description":"Limit result set to items with specific terms assigned in the product_funnel taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"product_funnel_exclude":{"description":"Limit result set to items except those with specific terms assigned in the product_funnel taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"project":{"description":"Limit result set to items with specific terms assigned in the project taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"project_exclude":{"description":"Limit result set to items except those with specific terms assigned in the project taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"industry":{"description":"Limit result set to items with specific terms assigned in the industry taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"industry_exclude":{"description":"Limit result set to items except those with specific terms assigned in the industry taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"business_size":{"description":"Limit result set to items with specific terms assigned in the business_size taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"business_size_exclude":{"description":"Limit result set to items except those with specific terms assigned in the business_size taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"lang":{"description":"Limit results to a specific language. By default, results are not filtered by language.","type":"string","enum":["","en","es","de","fr"],"default":"","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tribe_event_type":{"description":"The terms assigned to the post in the tribe_event_type taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tribe_post_state":{"description":"The terms assigned to the post in the tribe_post_state taxonomy.","type":"array","items":{"type":"integer"},"required":false},"product_funnel":{"description":"The terms assigned to the post in the product_funnel taxonomy.","type":"array","items":{"type":"integer"},"required":false},"project":{"description":"The terms assigned to the post in the project taxonomy.","type":"array","items":{"type":"integer"},"required":false},"industry":{"description":"The terms assigned to the post in the industry taxonomy.","type":"array","items":{"type":"integer"},"required":false},"business_size":{"description":"The terms assigned to the post in the business_size taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/tribe_stream"}]}},"\/wp\/v2\/tribe_stream\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tribe_event_type":{"description":"The terms assigned to the post in the tribe_event_type taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tribe_post_state":{"description":"The terms assigned to the post in the tribe_post_state taxonomy.","type":"array","items":{"type":"integer"},"required":false},"product_funnel":{"description":"The terms assigned to the post in the product_funnel taxonomy.","type":"array","items":{"type":"integer"},"required":false},"project":{"description":"The terms assigned to the post in the project taxonomy.","type":"array","items":{"type":"integer"},"required":false},"industry":{"description":"The terms assigned to the post in the industry taxonomy.","type":"array","items":{"type":"integer"},"required":false},"business_size":{"description":"The terms assigned to the post in the business_size taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/tribe_stream\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/tribe_stream\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/tribe_stream\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tribe_event_type":{"description":"The terms assigned to the post in the tribe_event_type taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tribe_post_state":{"description":"The terms assigned to the post in the tribe_post_state taxonomy.","type":"array","items":{"type":"integer"},"required":false},"product_funnel":{"description":"The terms assigned to the post in the product_funnel taxonomy.","type":"array","items":{"type":"integer"},"required":false},"project":{"description":"The terms assigned to the post in the project taxonomy.","type":"array","items":{"type":"integer"},"required":false},"industry":{"description":"The terms assigned to the post in the industry taxonomy.","type":"array","items":{"type":"integer"},"required":false},"business_size":{"description":"The terms assigned to the post in the business_size taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}]},"\/wp\/v2\/tribe_stream\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/partner_spotlight":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"lang":{"description":"Limit results to a specific language. By default, results are not filtered by language.","type":"string","enum":["","en","es","de","fr"],"default":"","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/partner_spotlight"}]}},"\/wp\/v2\/partner_spotlight\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/partner_spotlight\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/partner_spotlight\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/partner_spotlight\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}]},"\/wp\/v2\/partner_spotlight\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/tribe_service_post":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"service_format":{"description":"Limit result set to items with specific terms assigned in the service_format taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"service_format_exclude":{"description":"Limit result set to items except those with specific terms assigned in the service_format taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"lang":{"description":"Limit results to a specific language. By default, results are not filtered by language.","type":"string","enum":["","en","es","de","fr"],"default":"","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"service_format":{"description":"The terms assigned to the post in the service_format taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/tribe_service_post"}]}},"\/wp\/v2\/tribe_service_post\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"service_format":{"description":"The terms assigned to the post in the service_format taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/tribe_service_post\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/tribe_service_post\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/tribe_service_post\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"service_format":{"description":"The terms assigned to the post in the service_format taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}]},"\/wp\/v2\/tribe_service_post\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/tribe_tool_data":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","completed","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/tribe_tool_data"}]}},"\/wp\/v2\/tribe_tool_data\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/tribe_tool_data\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/tribe_tool_data\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/tribe_tool_post":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"tool_format":{"description":"Limit result set to items with specific terms assigned in the tool_format taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tool_format_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tool_format taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"product_funnel":{"description":"Limit result set to items with specific terms assigned in the product_funnel taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"product_funnel_exclude":{"description":"Limit result set to items except those with specific terms assigned in the product_funnel taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"project":{"description":"Limit result set to items with specific terms assigned in the project taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"project_exclude":{"description":"Limit result set to items except those with specific terms assigned in the project taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"industry":{"description":"Limit result set to items with specific terms assigned in the industry taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"industry_exclude":{"description":"Limit result set to items except those with specific terms assigned in the industry taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"business_size":{"description":"Limit result set to items with specific terms assigned in the business_size taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"business_size_exclude":{"description":"Limit result set to items except those with specific terms assigned in the business_size taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"lang":{"description":"Limit results to a specific language. By default, results are not filtered by language.","type":"string","enum":["","en","es","de","fr"],"default":"","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tool_format":{"description":"The terms assigned to the post in the tool_format taxonomy.","type":"array","items":{"type":"integer"},"required":false},"product_funnel":{"description":"The terms assigned to the post in the product_funnel taxonomy.","type":"array","items":{"type":"integer"},"required":false},"project":{"description":"The terms assigned to the post in the project taxonomy.","type":"array","items":{"type":"integer"},"required":false},"industry":{"description":"The terms assigned to the post in the industry taxonomy.","type":"array","items":{"type":"integer"},"required":false},"business_size":{"description":"The terms assigned to the post in the business_size taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/tribe_tool_post"}]}},"\/wp\/v2\/tribe_tool_post\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tool_format":{"description":"The terms assigned to the post in the tool_format taxonomy.","type":"array","items":{"type":"integer"},"required":false},"product_funnel":{"description":"The terms assigned to the post in the product_funnel taxonomy.","type":"array","items":{"type":"integer"},"required":false},"project":{"description":"The terms assigned to the post in the project taxonomy.","type":"array","items":{"type":"integer"},"required":false},"industry":{"description":"The terms assigned to the post in the industry taxonomy.","type":"array","items":{"type":"integer"},"required":false},"business_size":{"description":"The terms assigned to the post in the business_size taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/tribe_tool_post\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/tribe_tool_post\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/tribe_tool_post\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","completed"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tool_format":{"description":"The terms assigned to the post in the tool_format taxonomy.","type":"array","items":{"type":"integer"},"required":false},"product_funnel":{"description":"The terms assigned to the post in the product_funnel taxonomy.","type":"array","items":{"type":"integer"},"required":false},"project":{"description":"The terms assigned to the post in the project taxonomy.","type":"array","items":{"type":"integer"},"required":false},"industry":{"description":"The terms assigned to the post in the industry taxonomy.","type":"array","items":{"type":"integer"},"required":false},"business_size":{"description":"The terms assigned to the post in the business_size taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}]},"\/wp\/v2\/tribe_tool_post\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/types"}]}},"\/wp\/v2\/types\/(?P<type>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"description":"An alphanumeric identifier for the post type.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/statuses":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/statuses"}]}},"\/wp\/v2\/statuses\/(?P<status>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"An alphanumeric identifier for the status.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/taxonomies":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"type":{"description":"Limit results to taxonomies associated with a specific post type.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/taxonomies"}]}},"\/wp\/v2\/taxonomies\/(?P<taxonomy>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"taxonomy":{"description":"An alphanumeric identifier for the taxonomy.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/categories":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"lang":{"description":"Limit results to a specific language. By default, results are not filtered by language.","type":"string","enum":["","en","es","de","fr"],"default":"","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/categories"}]}},"\/wp\/v2\/categories\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/tags":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"lang":{"description":"Limit results to a specific language. By default, results are not filtered by language.","type":"string","enum":["","en","es","de","fr"],"default":"","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/tags"}]}},"\/wp\/v2\/tags\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"lang":{"type":"string","required":false},"translations":{"type":"object","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/menus":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/menus"}]}},"\/wp\/v2\/menus\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/wp_pattern_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/wp_pattern_category"}]}},"\/wp\/v2\/wp_pattern_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/ad-group":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/ad-group"}]}},"\/wp\/v2\/ad-group\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/tribe_download_type":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/tribe_download_type"}]}},"\/wp\/v2\/tribe_download_type\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/tribe_event_type":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/tribe_event_type"}]}},"\/wp\/v2\/tribe_event_type\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/tribe_format":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/tribe_format"}]}},"\/wp\/v2\/tribe_format\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/tribe_media_type":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/tribe_media_type"}]}},"\/wp\/v2\/tribe_media_type\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/tribe_post_state":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/tribe_post_state"}]}},"\/wp\/v2\/tribe_post_state\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/service_format":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/service_format"}]}},"\/wp\/v2\/service_format\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/tool_format":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/tool_format"}]}},"\/wp\/v2\/tool_format\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/product_funnel":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/product_funnel"}]}},"\/wp\/v2\/product_funnel\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/project":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/project"}]}},"\/wp\/v2\/project\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/industry":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/industry"}]}},"\/wp\/v2\/industry\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/business_size":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/business_size"}]}},"\/wp\/v2\/business_size\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/users":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"default":"asc","description":"Order sort attribute ascending or descending.","enum":["asc","desc"],"type":"string","required":false},"orderby":{"default":"name","description":"Sort collection by user attribute.","enum":["id","include","name","registered_date","slug","include_slugs","email","url"],"type":"string","required":false},"slug":{"description":"Limit result set to users with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"roles":{"description":"Limit result set to users matching at least one specific role provided. Accepts csv list or single role.","type":"array","items":{"type":"string"},"required":false},"capabilities":{"description":"Limit result set to users matching at least one specific capability provided. Accepts csv list or single capability.","type":"array","items":{"type":"string"},"required":false},"who":{"description":"Limit result set to users who are considered authors.","type":"string","enum":["authors"],"required":false},"has_published_posts":{"description":"Limit result set to users who have published posts.","type":["boolean","array"],"items":{"type":"string","enum":{"post":"post","page":"page","attachment":"attachment","nav_menu_item":"nav_menu_item","wp_block":"wp_block","wp_template":"wp_template","wp_template_part":"wp_template_part","wp_global_styles":"wp_global_styles","wp_navigation":"wp_navigation","wp_font_family":"wp_font_family","wp_font_face":"wp_font_face","ads":"ads","tribe_download":"tribe_download","tribe_media":"tribe_media","modal":"modal","tribe_stream":"tribe_stream","partner_spotlight":"partner_spotlight","tribe_service_post":"tribe_service_post","tribe_tool_data":"tribe_tool_data","tribe_tool_post":"tribe_tool_post"}},"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["email","name","id","username","slug"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"username":{"description":"Login name for the user.","type":"string","required":true},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":true},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US","es_ES"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":true},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/users"}]}},"\/wp\/v2\/users\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US","es_ES"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support trashing.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true}}}]},"\/wp\/v2\/users\/me":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US","es_ES"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false}}},{"methods":["DELETE"],"args":{"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support trashing.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/users\/me"}]}},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords":{"namespace":"wp\/v2","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":true}}},{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/introspect":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/(?P<uuid>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":false}}},{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/comments":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to comments published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_exclude":{"description":"Ensure result set excludes comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_email":{"default":null,"description":"Limit result set to that from a specific author email. Requires authorization.","format":"email","type":"string","required":false},"before":{"description":"Limit response to comments published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by comment attribute.","type":"string","default":"date_gmt","enum":["date","date_gmt","id","include","post","parent","type"],"required":false},"parent":{"default":[],"description":"Limit result set to comments of specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"parent_exclude":{"default":[],"description":"Ensure result set excludes specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"post":{"default":[],"description":"Limit result set to comments assigned to specific post IDs.","type":"array","items":{"type":"integer"},"required":false},"status":{"default":"approve","description":"Limit result set to comments assigned a specific status. Requires authorization.","type":"string","required":false},"type":{"default":"comment","description":"Limit result set to comments assigned a specific type. Requires authorization.","type":"string","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"lang":{"description":"Limit results to a specific language. By default, results are not filtered by language.","type":"string","enum":["","en","es","de","fr"],"default":"","required":false}}},{"methods":["POST"],"args":{"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"default":0,"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"default":0,"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"Note resolution status","default":"","enum":["resolved","reopen"]}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/comments"}]}},"\/wp\/v2\/comments\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"Note resolution status","default":"","enum":["resolved","reopen"]}},"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false}}}]},"\/wp\/v2\/block-renderer\/(?P<name>[a-z0-9-]+\/[a-z0-9-]+)":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET","POST"],"args":{"name":{"description":"Unique registered name for the block.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["edit"],"default":"view","required":false},"attributes":{"description":"Attributes for the block.","type":"object","default":[],"required":false},"post_id":{"description":"ID of the post context.","type":"integer","required":false}}}]},"\/wp\/v2\/block-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/block-types"}]}},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false}}}]},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)\/(?P<name>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Block name.","type":"string","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/settings":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"title":{"title":"Title","description":"Site title.","type":"string","required":false},"description":{"title":"Tagline","description":"Site tagline.","type":"string","required":false},"timezone":{"title":"","description":"A city in the same timezone as you.","type":"string","required":false},"date_format":{"title":"","description":"A date format for all date strings.","type":"string","required":false},"time_format":{"title":"","description":"A time format for all time strings.","type":"string","required":false},"start_of_week":{"title":"","description":"A day number of the week that the week should start on.","type":"integer","required":false},"language":{"title":"","description":"WordPress locale code.","type":"string","required":false},"use_smilies":{"title":"","description":"Convert emoticons like :-) and :-P to graphics on display.","type":"boolean","required":false},"default_category":{"title":"","description":"Default post category.","type":"integer","required":false},"default_post_format":{"title":"","description":"Default post format.","type":"string","required":false},"posts_per_page":{"title":"Maximum posts per page","description":"Blog pages show at most.","type":"integer","required":false},"show_on_front":{"title":"Show on front","description":"What to show on the front page","type":"string","required":false},"page_on_front":{"title":"Page on front","description":"The ID of the page that should be displayed on the front page","type":"integer","required":false},"page_for_posts":{"title":"","description":"The ID of the page that should display the latest posts","type":"integer","required":false},"default_ping_status":{"title":"","description":"Allow link notifications from other blogs (pingbacks and trackbacks) on new articles.","type":"string","enum":["open","closed"],"required":false},"default_comment_status":{"title":"Allow comments on new posts","description":"Allow people to submit comments on new posts.","type":"string","enum":["open","closed"],"required":false},"site_logo":{"title":"Logo","description":"Site logo.","type":"integer","required":false},"site_icon":{"title":"Icon","description":"Site icon.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/settings"}]}},"\/wp\/v2\/themes":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"Limit result set to themes assigned one or more statuses.","type":"array","items":{"enum":["active","inactive"],"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/themes"}]}},"\/wp\/v2\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"stylesheet":{"description":"The theme's stylesheet. This uniquely identifies the theme.","type":"string","required":false}}}]},"\/wp\/v2\/plugins":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"status":{"description":"Limits results to plugins with the given status.","type":"array","items":{"type":"string","enum":["inactive","active","network-active"]},"required":false}}},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","pattern":"[\\w\\-]+","required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active","network-active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/plugins"}]}},"\/wp\/v2\/plugins\/(?P<plugin>[^.\\\/]+(?:\\\/[^.\\\/]+)?)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active","network-active"],"required":false}}},{"methods":["DELETE"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false}}}]},"\/wp\/v2\/sidebars":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/sidebars"}]}},"\/wp\/v2\/sidebars\/(?P<id>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a registered sidebar","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"widgets":{"description":"Nested widgets.","type":"array","items":{"type":["object","string"]},"required":false}}}]},"\/wp\/v2\/widget-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/widget-types"}]}},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The widget type id.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/encode":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false},"form_data":{"description":"Serialized widget form data to encode into instance settings.","type":"string","required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/render":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false}}}]},"\/wp\/v2\/widgets":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"sidebar":{"description":"The sidebar to return widgets for.","type":"string","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"default":"wp_inactive_widgets","description":"The sidebar the widget belongs to.","type":"string","required":true},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/widgets"}]}},"\/wp\/v2\/widgets\/(?P<id>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"description":"The sidebar the widget belongs to.","type":"string","required":false},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"force":{"description":"Whether to force removal of the widget, or move it to the inactive sidebar.","type":"boolean","required":false}}}]},"\/wp\/v2\/block-directory\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"term":{"description":"Limit result set to blocks matching the search term.","type":"string","minLength":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/block-directory\/search"}]}},"\/wp\/v2\/pattern-directory\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","minLength":1,"required":false},"category":{"description":"Limit results to those matching a category ID.","type":"integer","minimum":1,"required":false},"keyword":{"description":"Limit results to those matching a keyword ID.","type":"integer","minimum":1,"required":false},"slug":{"description":"Limit results to those matching a pattern (slug).","type":"array","required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","favorite_count"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/pattern-directory\/patterns"}]}},"\/wp\/v2\/block-patterns\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/block-patterns\/patterns"}]}},"\/wp\/v2\/block-patterns\/categories":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/block-patterns\/categories"}]}},"\/wp-site-health\/v1":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-site-health\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp-site-health\/v1"}]}},"\/wp-site-health\/v1\/tests\/background-updates":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp-site-health\/v1\/tests\/background-updates"}]}},"\/wp-site-health\/v1\/tests\/loopback-requests":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp-site-health\/v1\/tests\/loopback-requests"}]}},"\/wp-site-health\/v1\/tests\/https-status":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp-site-health\/v1\/tests\/https-status"}]}},"\/wp-site-health\/v1\/tests\/dotorg-communication":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp-site-health\/v1\/tests\/dotorg-communication"}]}},"\/wp-site-health\/v1\/tests\/authorization-header":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp-site-health\/v1\/tests\/authorization-header"}]}},"\/wp-site-health\/v1\/directory-sizes":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp-site-health\/v1\/directory-sizes"}]}},"\/wp-site-health\/v1\/tests\/page-cache":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp-site-health\/v1\/tests\/page-cache"}]}},"\/wp-block-editor\/v1":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-block-editor\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp-block-editor\/v1"}]}},"\/wp-block-editor\/v1\/url-details":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL to process.","type":"string","format":"uri","required":true}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp-block-editor\/v1\/url-details"}]}},"\/wp\/v2\/menu-locations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/menu-locations"}]}},"\/wp\/v2\/menu-locations\/(?P<location>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"location":{"description":"An alphanumeric identifier for the menu location.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp-block-editor\/v1\/export":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp-block-editor\/v1\/export"}]}},"\/wp-block-editor\/v1\/navigation-fallback":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp-block-editor\/v1\/navigation-fallback"}]}},"\/wp\/v2\/font-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/font-collections"}]}},"\/wp\/v2\/font-collections\/(?P<slug>[\\\/\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp-abilities\/v1":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-abilities\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp-abilities\/v1"}]}},"\/wp-abilities\/v1\/categories":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp-abilities\/v1\/categories"}]}},"\/wp-abilities\/v1\/categories\/(?P<slug>[a-z0-9]+(?:-[a-z0-9]+)*)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"Unique identifier for the ability category.","type":"string","pattern":"^[a-z0-9]+(?:-[a-z0-9]+)*$","required":false}}}]},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+?)\/run":{"namespace":"wp-abilities\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"name":{"description":"Unique identifier for the ability.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false},"input":{"description":"Input parameters for the ability execution.","type":["integer","number","boolean","string","array","object","null"],"default":null,"required":false}}}]},"\/wp-abilities\/v1\/abilities":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"category":{"description":"Limit results to abilities in specific ability category.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp-abilities\/v1\/abilities"}]}},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Unique identifier for the ability.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false}}}]}},"site_logo":0,"site_icon":54976,"site_icon_url":"https:\/\/thedigitalprojectmanager.com\/wp-content\/uploads\/2021\/07\/DPM-favicon-blue-192px.png","_links":{"help":[{"href":"https:\/\/developer.wordpress.org\/rest-api\/"}],"wp:featuredmedia":[{"embeddable":true,"type":"site_icon","href":"https:\/\/thedigitalprojectmanager.com\/wp-json\/wp\/v2\/media\/54976"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}